| 1 |
46673 |
Removing reflectors, placing new reflectors, removing damaged raised reflective ... |
02 |
VARIOUS |
3 |
2
|
PAVEMENT MARKINGS
|
$2.3M |
| 2 |
46674 |
Removing existing guardrail delineators and barrier wall delineators and install... |
02 |
VARIOUS |
4 |
2
|
FENCING & GUARDRAIL
|
$200,665 |
| 3 |
46677 |
Pavement marking on various routes in various counties of District 6. |
06 |
VARIOUS |
7 |
2
|
PAVEMENT MARKINGS
|
$2.3M |
| 4 |
62P01 |
The project primarily consists of a single culvert removal and replacement locat... |
01 |
WILL |
131 |
7
|
EARTHWORK
|
$5.1M (128/131) |
| 5 |
62R19 |
Replacement and upgrading of the existing Intelligent Transportation Systems (IT... |
01 |
VARIOUS |
105 |
4
|
ELECTRICAL
|
$10.5M (101/105) |
| 6 |
62V09 |
(1621-Ft) Intersection Improvements and Traffic Modernization will involve right... |
01 |
COOK |
154 |
5
|
ASPHALT
|
$2.1M (153/154) |
| 7 |
62V43 |
(1.54-Mile) Project consists of pavement patching, HMA overlay of p.c.c pavement... |
01 |
KANE |
63 |
4
|
ASPHALT
|
$3.5M |
| 8 |
62W78 |
Project includes Lighting Improvement including removal of light towers and repl... |
01 |
LAKE |
63 |
3
|
ELECTRICAL
|
$1.5M (61/63) |
| 9 |
62X88 |
(6,935-Ft) Designed and Standard Overlays, ADA sidewalk ramp Improvement, paveme... |
01 |
COOK |
107 |
5
|
ASPHALT
|
$3.3M |
| 10 |
62Y17 |
(460-Ft) Bridge Deck Overlay (SN 016-0634) consist of joint replacement, substru... |
01 |
COOK |
57 |
5
|
MISC & PRO SERVICES
|
$752,257 (52/57) |
| 11 |
62Y26 |
(4,658.13-Ft) Bridge Repairs (S.N. 099-0298) includes bridge deck scarification ... |
01 |
WILL |
62 |
8
|
MISC & PRO SERVICES
|
$687,082 (58/62) |
| 12 |
62Y35 |
This work consists of mowing the roadsides of Expressways in District One. |
01 |
VARIOUS |
4 |
8
|
LANDSCAPE
|
$637,908 |
| 13 |
62Y37 |
This project is to provide prompt installation of new fence and repair of damage... |
01 |
VARIOUS |
19 |
2
|
FENCING & GUARDRAIL
|
$917,543 |
| 14 |
64J38 |
1.2 miles of cold milling, standard overlay, patching, ADA improvements and traf... |
02 |
WHITESIDE |
113 |
2
|
ASPHALT
|
$2.7M |
| 15 |
64S71 |
10.3 miles of milling, HMA overlay, shoulders, and patching on IL 84 from 0.2 mi... |
02 |
CARROLL |
75 |
2
|
ASPHALT
|
$7.4M (74/75) |
| 16 |
64T23 |
1,200 feet gross pavement patching on I-39 under Twombly Rd overpass. 2 Miles NE... |
02 |
OGLE |
8 |
5
|
PCC FLATWORK
|
$194,077 |
| 17 |
64V11 |
Bridge washing of 11 structures along I-74 in Rock Island County. |
02 |
ROCK ISLAND |
16 |
3
|
TRAFFIC CONTROL
|
$304,215 |
| 18 |
64V12 |
Bridge washing of SN 101-0133 and 101-0134 over the Kishwaukee River in Winnebag... |
02 |
WINNEBAGO |
4 |
3
|
MISC & PRO SERVICES
|
$98,355 |
| 19 |
64V13 |
Bridge washing of 9 structures in Boone and Winnebago Counties. |
02 |
BOONE |
15 |
3
|
TRAFFIC CONTROL
|
$339,460 |
| 20 |
64V14 |
Bridge washing of 17 structures in various counties. |
02 |
VARIOUS |
22 |
3
|
MISC & PRO SERVICES
|
$355,659 |
| 21 |
64V15 |
Bridge washing of 12 structures in various counties. |
02 |
VARIOUS |
17 |
3
|
MISC & PRO SERVICES
|
$277,790 |
| 22 |
68474 |
Resurfacing IL 6 from 0.7 mile north of Hoerr's Pond to south of I-74 in Peoria ... |
04 |
PEORIA |
130 |
1
|
ASPHALT
|
$18.7M (129/130) |
| 23 |
68C43 |
Tree mitigation and prairie restoration at various locations adjacent to the NW ... |
04 |
MCDONOUGH |
19 |
1
|
LANDSCAPE
|
$268,410 (15/19) |
| 24 |
68E33 |
Bridge replacement of SN 062-0008 with SN 062-0074 carrying IL 29 over Barrville... |
04 |
MARSHALL |
91 |
2
|
STRUCTURAL
|
$2.0M |
| 25 |
68J46 |
0.24 mile intersection improvement, Extended EP US 150 left-turn lane, widening ... |
04 |
PEORIA |
76 |
3
|
PCC FLATWORK
|
$637,641 |
| 26 |
68J51 |
316' bridge preservation project at SN 072-0169 carrying IL 8 (Southport Rd) ove... |
04 |
PEORIA |
35 |
3
|
STRUCTURAL
|
$954,237 |
| 27 |
68J68 |
Resurfacing and cold-in-place recycling on Il 78 from Fort St in Farmington to 0... |
04 |
FULTON |
61 |
2
|
ASPHALT
|
$10.1M (60/61) |
| 28 |
68J96 |
8.765 miles of resurfacing and cold-in-place recycling on IL 17 from IL 89 to we... |
04 |
MARSHALL |
42 |
1
|
ASPHALT
|
$11.4M (41/42) |
| 29 |
68K06 |
Electrical maintenance contract (maintenance and repair D4 traffic signals, over... |
04 |
VARIOUS |
40 |
2
|
ELECTRICAL
|
$599,963 |
| 30 |
68K11 |
Washing of seven bridges in Disrict 4. |
04 |
VARIOUS |
23 |
1
|
STRUCTURAL
|
$1.6M |
| 31 |
68K15 |
6.47 miles of resurfacing on IL 78 from west of US 150 to south of IL 8 in Peori... |
04 |
PEORIA |
52 |
2
|
ASPHALT
|
$5.7M (51/52) |
| 32 |
68K16 |
3.53 miles of milling and resurfacing and all related collateral work along US R... |
04 |
PEORIA |
56 |
2
|
ASPHALT
|
$5.9M (54/56) |
| 33 |
68K58 |
Replace expansion joints, patch parapets, fill slopewall voids on SN 036-0009 on... |
04 |
HENDERSON |
31 |
3
|
TRAFFIC CONTROL
|
$362,548 (30/31) |
| 34 |
68K62 |
Cleaning and painting structural steel of eleven existing bridges throughout Dis... |
04 |
VARIOUS |
44 |
4
|
MISC & PRO SERVICES
|
$2.6M |
| 35 |
68K91 |
Districtwide repairs to guardrail and cable guardrail caused by motorists (MCHD)... |
04 |
VARIOUS |
53 |
2
|
FENCING & GUARDRAIL
|
$837,595 (51/53) |
| 36 |
70F37 |
Bridge deck overlay and other repairs to SN 057-0163, SN 057-0164 over Money Cre... |
05 |
MCLEAN |
106 |
1
|
STRUCTURAL
|
$4.1M (97/106) |
| 37 |
70F77 |
Remove and construct bridge decks on two structures SN 057-0154 (SB) and 057-015... |
05 |
MCLEAN |
113 |
1
|
STRUCTURAL
|
$5.5M (111/113) |
| 38 |
70H61 |
Bridge beam replacement and pier repair to S.N. 010-0220 at Salt Fork River 1 mi... |
05 |
CHAMPAIGN |
13 |
3
|
STRUCTURAL
|
$428,167 (12/13) |
| 39 |
70H62 |
Bridge deck repairs to S.N. 021-0049 and S.N. 023-0026 carrying FAP 820 (IL-130)... |
05 |
DOUGLAS |
29 |
2
|
STRUCTURAL
|
$729,881 (27/29) |
| 40 |
70H81 |
2.11 miles of median cable improvements on I-74 from 0.3 miles west of County Rd... |
05 |
CHAMPAIGN |
8 |
2
|
FENCING & GUARDRAIL
|
$331,808 |
| 41 |
72295 |
2.1 miles of resurfacing, patching, ADA improvements, traffic signal improvement... |
06 |
ADAMS |
173 |
1
|
ASPHALT
|
$9.1M (172/173) |
| 42 |
72440 |
2.6 miles of milling and resurfacing on Old US 66 from Old US 66 to south of Wes... |
06 |
MACOUPIN |
27 |
3
|
ASPHALT
|
$1.6M |
| 43 |
72540 |
On-call repair of guardrail, cable guardrail and impact attenuators at various l... |
06 |
VARIOUS |
40 |
3
|
FENCING & GUARDRAIL
|
$2.1M (34/40) |
| 44 |
72542 |
Resurfacing on IL 97, 123 from IC and IM Railroad to Antle Street and from south... |
06 |
MENARD |
12 |
3
|
ASPHALT
|
$566,339 |
| 45 |
72546 |
Installation of cure-in-place pipe liners at 12 locations on I-72 in Sangamon Co... |
06 |
SANGAMON |
3 |
2
|
UNDERGROUND
|
$671,420 |
| 46 |
72762 |
11.7 miles of standard overlay, concrete gutter repairs, riprap and culvert reha... |
06 |
SCHUYLER |
77 |
2
|
ASPHALT
|
$6.1M (76/77) |
| 47 |
72989 |
1.9 miles of resurfacing on Dirksen Parkway from Stevenson Drive to south of Wid... |
06 |
SANGAMON |
64 |
2
|
ASPHALT
|
$4.1M (62/64) |
| 48 |
72C96 |
Patching and resurfacing on I-55 from 2.8 miles south of IL 123 in Williamsville... |
06 |
SANGAMON |
102 |
2
|
ASPHALT
|
$18.9M (101/102) |
| 49 |
74433 |
Replacement of SN 012-0014 carrying IL 1 over the CSX Railroad, 0.5 miles north ... |
07 |
CLARK |
148 |
2
|
STRUCTURAL
|
$11.1M (146/148) |
| 50 |
74435 |
Reconstructing the I-57 and IL 16 interchange located east of Mattoon from a clo... |
07 |
COLES |
358 |
5
|
EARTHWORK
|
$53.7M (354/358) |
| 51 |
74650 |
Superstructure replacement and bridge widening of 2 structures on I-57 over IC R... |
07 |
COLES |
128 |
3
|
STRUCTURAL
|
$11.1M (127/128) |
| 52 |
74705 |
Replacement of 2 structures carrying I-72 over IL 121 and the IC Railroad, north... |
07 |
MACON |
115 |
0
|
STRUCTURAL
|
$10.0M |
| 53 |
74D64 |
64.5 miles of weed spray control on I-57 and I-70 in Effingham and Fayette Count... |
07 |
EFFINGHAM |
3 |
7
|
MISC & PRO SERVICES
|
$85,783 |
| 54 |
76T66 |
Structural, mechanical and electrical repairs to the Joe Page Bridge in Hardin. ... |
08 |
GREENE |
73 |
0
|
MISC & PRO SERVICES
|
$10.8M (70/73) |
| 55 |
76U42 |
7 miles of microsurfacing on I-255 from the St. Clair County line to I-270. |
08 |
MADISON |
28 |
2
|
ASPHALT
|
$6.7M |
| 56 |
76U67 |
4.4 miles of patching and slurry seal on MLK Drive, Louisiana Boulevard and Lake... |
08 |
ST CLAIR |
31 |
3
|
ASPHALT
|
$936,894 (28/31) |
| 57 |
76U73 |
Bridge deck overlay and repairs on 5 structures I-64 in East St. Louis. (SN 082-... |
08 |
ST CLAIR |
19 |
2
|
TRAFFIC CONTROL
|
$301,605 (13/19) |
| 58 |
78967 |
Replacement of SN 039-0026 carrying IL 3 over Worthen Bayou, 1.2 miles south of ... |
09 |
JACKSON |
84 |
3
|
STRUCTURAL
|
$3.4M |
| 59 |
78A87 |
Signal modifications, pedestrian crossings and sidewalks at the intersection of ... |
09 |
FRANKLIN |
67 |
0
|
ELECTRICAL
|
$606,565 (66/67) |
| 60 |
78B34 |
Bridge deck overlay on 3 sets of dual bridges on I-64: 1) approximately 2 miles ... |
09 |
JEFFERSON |
92 |
4
|
STRUCTURAL
|
$5.9M (84/92) |
| 61 |
78B83 |
Building demolition and site cleanup at 3 locations in West City, Benton and Har... |
09 |
FRANKLIN |
14 |
3
|
TRAFFIC CONTROL
|
$253,399 |
| 62 |
80B08 |
(1.21-Mile) Smart Overlay consists of hot-mix asphalt surface removal, pavement ... |
01 |
DUPAGE |
84 |
4
|
ASPHALT
|
$2.7M |
| 63 |
80B13 |
(1.07-Mile) Standard Overlay and ADA Improvements project includes hot-mix aspha... |
01 |
WILL |
91 |
6
|
ASPHALT
|
$2.0M |
| 64 |
80B15 |
(8,333-Ft) Standard Overlay of the existing PCC pavement with HMA surface course... |
01 |
DUPAGE |
99 |
6
|
ASPHALT
|
$5.6M |
| 65 |
80B75 |
(4.21-Mile) Standard overlay and ADA curb ramp improvement project consists of a... |
01 |
LAKE |
137 |
4
|
ASPHALT
|
$4.1M (136/137) |
| 66 |
80B83 |
Litter Picking shall consist of the pickup, removal and satisfactory disposal of... |
01 |
COOK |
1 |
9
|
MISC & PRO SERVICES
|
$432,166 |
| 67 |
80B84 |
Litter Picking shall consist of the pickup, removal and satisfactory disposal of... |
01 |
COOK |
1 |
9
|
MISC & PRO SERVICES
|
$569,550 |
| 68 |
61L39 |
Pavement widening and traffic signal improvements from Orchard Rd. to Randall Rd... |
01 |
KANE |
144 |
4
|
ASPHALT
|
$3.1M (143/144) |
| 69 |
61L66 |
Resurfacing Barrington Avenue from IL 68 to Van Buren Street in the village of E... |
01 |
KANE |
44 |
6
|
ASPHALT
|
$664,210 |
| 70 |
61L87 |
HMA resurfacing of School Street from W 144th Street to W. 138th Street in the V... |
01 |
COOK |
73 |
4
|
ASPHALT
|
$1.3M |
| 71 |
61L93 |
Resurfacing of Euclid Avenue from Rohlwing Road to Rand Road in the Village of A... |
01 |
COOK |
181 |
8
|
ASPHALT
|
$7.6M (180/181) |
| 72 |
61M05 |
Resurfacing 173rd Street from Wausau Avenue to South Park Avenue in the Village ... |
01 |
COOK |
49 |
4
|
ASPHALT
|
$553,385 (48/49) |
| 73 |
61M16 |
Resurfacing and channelization on Gannon Drive from Golf Road to Higgins Road in... |
01 |
COOK |
98 |
6
|
PCC FLATWORK
|
$1.1M |
| 74 |
61M18 |
Resurfacing 171st Street from California Avenue to I-80/294 and from Western Ave... |
01 |
COOK |
54 |
4
|
ASPHALT
|
$616,560 (53/54) |
| 75 |
61M19 |
Resurfacing Queen Anne Road from IL 120 to Bull Valley Road in the Village of Bu... |
01 |
MCHENRY |
49 |
6
|
ASPHALT
|
$948,630 |
| 76 |
61M20 |
Lighting improvements on IL 50 from 87th Street to 111th Street in the Village o... |
01 |
COOK |
11 |
2
|
ELECTRICAL
|
$754,604 (10/11) |
| 77 |
61M21 |
Lighting improvements on US 20 from 69th Avenue to 54th Avenue and from IL 50 to... |
01 |
COOK |
13 |
2
|
ELECTRICAL
|
$770,787 (12/13) |
| 78 |
61M23 |
Resurfacing of Ballard Road from IL 47 to Pauline Avenue in the Village of Lakew... |
01 |
MCHENRY |
48 |
5
|
ASPHALT
|
$1.5M |
| 79 |
61M25 |
Rehabilitate of three-span RC channel beam bridge carrying Smith Road over Long ... |
01 |
WILL |
79 |
5
|
MISC & PRO SERVICES
|
$1.9M (77/79) |
| 80 |
61M26 |
HMA resurfacing of Braintree Drive from Wise Road to Weathersfield Way in the vi... |
01 |
COOK |
226 |
5
|
UNDERGROUND
|
$12.2M (217/226) |
| 81 |
61M27 |
HMA resurfacing of Braintree Road from Weathersfield Way to Schaumburg Road in t... |
01 |
COOK |
189 |
7
|
UNDERGROUND
|
$3.5M (186/189) |
| 82 |
61M28 |
HMA resurfacing of Braintree Drive from Schaumburg Road to Bode Road in the vill... |
01 |
COOK |
172 |
8
|
UNDERGROUND
|
$4.3M (170/172) |
| 83 |
61M31 |
Resurfacing Jones Road from Highland Boulevard to IL 72 in the village of Hoffma... |
01 |
COOK |
55 |
6
|
ASPHALT
|
$978,922 |
| 84 |
61M32 |
Resurfacing Montrose Avenue from Sayre Avenue to Forest Preserve Drive in the vi... |
01 |
COOK |
75 |
5
|
ASPHALT
|
$1.3M |
| 85 |
76V04 |
Weed control at various locations in Madison and Jersey Counties. |
08 |
JERSEY |
2 |
6
|
LANDSCAPE
|
$490,456 |
| 86 |
85789 |
Resurfacing German Church Road from IL 72 to Deer Path Road. |
02 |
OGLE |
16 |
3
|
ASPHALT
|
$1.2M |
| 87 |
85790 |
Traffic signal improvement at various intersections in the City of Moline. |
02 |
ROCK ISLAND |
27 |
1
|
ELECTRICAL
|
$399,391 (25/27) |
| 88 |
91660 |
Resurfacing, aggregate shoulders and guardrail improvement on CH 7 from IL 165 t... |
05 |
MCLEAN |
31 |
2
|
ASPHALT
|
$3.0M |
| 89 |
93845 |
Construction of a single span PPC deck beam bridge carrying 2980 East Road over ... |
06 |
HANCOCK |
41 |
3
|
STRUCTURAL
|
$607,954 (39/41) |
| 90 |
93852 |
Reconstruction of West Lafayette Street from Jackson Street to Monroe Street in ... |
06 |
SCHUYLER |
61 |
5
|
PCC FLATWORK
|
$1.1M (58/61) |
| 91 |
93853 |
Cold-in-place recycling and HMA resurfacing of CH 2 and a portion of CH 14 in Pi... |
06 |
PIKE |
25 |
3
|
ASPHALT
|
$5.2M (24/25) |
| 92 |
97889 |
HMA resurfacing of various roadways in the village of Valmeyer. Additionally inc... |
08 |
MONROE |
32 |
3
|
ASPHALT
|
$787,476 |
| 93 |
62R23 |
(2,215.87-Ft) Replacement of the Des Plaines River Bridge including the realignm... |
01 |
WILL |
479 |
6
|
STRUCTURAL
|
$93.3M (446/479) |
| 94 |
62T82 |
Project consists of a single culvert removal and replacement includes shoulder w... |
01 |
LAKE |
94 |
3
|
DEMOLITION
|
$1.2M (93/94) |
| 95 |
62X31 |
(650-Ft) Two culverts (SN 016-2290 and SN 099-0541) will undergo routine mainten... |
01 |
COOK |
22 |
0
|
MISC & PRO SERVICES
|
$231,852 (21/22) |
| 96 |
62X53 |
(185-ft) Proposed Culvert Repairs improvements is located at the intersection of... |
01 |
COOK |
5 |
6
|
MISC & PRO SERVICES
|
$105,718 (4/5) |
| 97 |
64R72 |
0.725 miles; Reconstruction; Harrison Ave: Mill Rd to 0.3 miles east of Kishwauk... |
02 |
WINNEBAGO |
366 |
4
|
STRUCTURAL
|
$26.6M (365/366) |
| 98 |
87910 |
HMA resurfacing of CH 29 from IL 18 to CH 64 in LaSalle County. Additionally inc... |
03 |
LASALLE |
28 |
2
|
ASPHALT
|
$1.3M |
| 99 |
64U56 |
House demolition at 492 Wall St. and 380 Wisconsin Ave. in East Dubuque. |
02 |
JODAVIESS |
17 |
2
|
TRAFFIC CONTROL
|
$233,977 |
| 100 |
64U96 |
Full cleaning and painting of SN's 081-0122/0123 and SN's 081-0128/0129. |
02 |
ROCK ISLAND |
19 |
5
|
MISC & PRO SERVICES
|
$612,215 |
| 101 |
64U97 |
Full cleaning and painting of SN's 081-0134/0135 and SN's 098-0063/0064. |
02 |
ROCK ISLAND |
19 |
4
|
MISC & PRO SERVICES
|
$613,149 |
| 102 |
66N22 |
Plug and abandon existing culvert (SN 047-2514) carrying IL 71 over a stream loc... |
03 |
KENDALL |
42 |
6
|
TRAFFIC CONTROL
|
$323,984 |
| 103 |
66P67 |
Milling and resurfacing 3 3/4" (designed overlay)_on FAP 587 (US 34) beginning 0... |
03 |
LASALLE |
55 |
2
|
ASPHALT
|
$4.4M (53/55) |
| 104 |
66R39 |
Routing and filling primarily longitudinal but includes transverse as needed fro... |
03 |
KANKAKEE |
6 |
4
|
TRAFFIC CONTROL
|
$117,022 |
| 105 |
66R41 |
Crack sealing on ILL 47 in Gibson City to 900E Rd, and IL 115 to Baltimore Dr in... |
03 |
FORD |
7 |
5
|
ASPHALT
|
$135,027 |
| 106 |
66R92 |
Cleaning and painting structural steel, pavement striping, and traffic control a... |
03 |
BUREAU |
24 |
4
|
MISC & PRO SERVICES
|
$801,916 |
| 107 |
66R93 |
Cleaning and painting all structural steel and_non- structural steel components ... |
03 |
LIVINGSTON |
14 |
5
|
MISC & PRO SERVICES
|
$324,121 |
| 108 |
66R94 |
Cleaning and painting all structural steel and non-structure_steel components on... |
03 |
GRUNDY |
17 |
5
|
MISC & PRO SERVICES
|
$328,787 |
| 109 |
66R95 |
cleaning and painting all structural steel and non-structural steel components o... |
03 |
BUREAU |
14 |
4
|
MISC & PRO SERVICES
|
$345,099 |
| 110 |
66T02 |
Cleaning and painting all structural steel and_non-structural steel components o... |
03 |
IROQUOIS |
13 |
5
|
MISC & PRO SERVICES
|
$326,122 |
| 111 |
66T06 |
Cleaning and painting all structural steel and non-structural steel of SN's: 006... |
03 |
BUREAU |
18 |
4
|
MISC & PRO SERVICES
|
$527,962 |
| 112 |
68F91 |
6.24 miles of resurfacing from SCL of Avon to IL 9 in Fulton and McDonough Count... |
04 |
FULTON |
121 |
1
|
ASPHALT
|
$12.1M (116/121) |
| 113 |
74D53 |
5.5 miles of patching, milling and resurfacing on Old US 50 from US 50 Business ... |
07 |
LAWRENCE |
41 |
1
|
ASPHALT
|
$3.0M |
| 114 |
68K56 |
Bridge deck and approach pavement resurfacing, replacement of existing expansion... |
04 |
TAZEWELL |
18 |
1
|
TRAFFIC CONTROL
|
$104,542 (17/18) |
| 115 |
68K57 |
Clearing and disposing the existing silt in and around Structure No. 062-2001, i... |
04 |
MARSHALL |
4 |
3
|
TRAFFIC CONTROL
|
$81,864 |
| 116 |
68K59 |
Re-applying bituminous material binder to the existing aggregate slopewalls at S... |
04 |
MCDONOUGH |
5 |
0
|
TRAFFIC CONTROL
|
$84,915 (4/5) |
| 117 |
70H66 |
Bridge deck sealing of 63 structures in McLean County. |
05 |
MCLEAN |
6 |
3
|
STRUCTURAL
|
$333,296 |
| 118 |
72469 |
8.4 miles of microsurfacing on Mt. Auburn Road from south of Arch Street in Mt. ... |
06 |
CHRISTIAN |
17 |
2
|
ASPHALT
|
$749,586 |
| 119 |
72A82 |
18.3 miles of crack and joint sealing on various routes in Adams, Morgan and Pik... |
06 |
VARIOUS |
8 |
4
|
TRAFFIC CONTROL
|
$400,179 |
| 120 |
72J75 |
2.9 miles of resurfacing on the I-55 East Frontage Road from 0.3 miles north of ... |
06 |
MONTGOMERY |
29 |
1
|
ASPHALT
|
$1.7M |
| 121 |
74368 |
Bridge replacement on IL 48 over Mosquito Creek, 1.5 miles northeast of Blue Mou... |
07 |
MACON |
81 |
3
|
STRUCTURAL
|
$2.2M |
| 122 |
74653 |
Replacement of SN 015-0034 carrying CH 31 over the Little Wabash River, 0.8 mile... |
07 |
COLES |
59 |
3
|
STRUCTURAL
|
$2.5M |
| 123 |
74C49 |
Bridge joint replacement, abutment and pier repair, new approaches, bridge deck ... |
07 |
CLARK |
65 |
3
|
STRUCTURAL
|
$1.2M (58/65) |
| 124 |
74D47 |
Bridge deck sealing on 98 bridge decks throughout Effingham and Fayette Counties... |
07 |
EFFINGHAM |
10 |
3
|
TRAFFIC CONTROL
|
$511,953 |
| 125 |
74E30 |
Guardrail repairs of existing damage from motorists at locations shown on the pl... |
07 |
VARIOUS |
27 |
3
|
FENCING & GUARDRAIL
|
$873,114 |
| 126 |
76A37 |
Bridge replacement on Old US 51 over Crooked Creek, 0.3 miles north of Central C... |
08 |
MARION |
73 |
2
|
STRUCTURAL
|
$3.4M |
| 127 |
76B42 |
Bridge replacement on US 51 over Louse Run Tributary, 2 miles south of Patoka, a... |
08 |
MARION |
113 |
2
|
STRUCTURAL
|
$3.6M |
| 128 |
76U40 |
4 miles of resurfacing on US 51 from Texas Avenue in Sandoval to north of Centra... |
08 |
MARION |
55 |
2
|
ASPHALT
|
$7.6M (54/55) |
| 129 |
76U43 |
3.9 miles of resurfacing on IL 255 from 0.1 miles north of Seminary Road to US 6... |
08 |
MADISON |
35 |
2
|
ASPHALT
|
$7.1M |
| 130 |
76U52 |
Various pavement patching call-out locations throughout District 8. |
08 |
VARIOUS |
30 |
4
|
TRAFFIC CONTROL
|
$1.3M (29/30) |
| 131 |
76U71 |
2.2 miles of chip seal at various locations: Hilltop Road from 0.6 miles north o... |
08 |
MONROE |
15 |
2
|
ASPHALT
|
$340,384 |
| 132 |
76U78 |
2.3 miles of patching on IL 203 from the I-270 westbound ramps to Branding Avenu... |
08 |
MADISON |
26 |
6
|
PCC FLATWORK
|
$1.1M |
| 133 |
76V02 |
1.7 miles of resurfacing on IL 177 from County Road to Mine Road in Mascoutah. |
08 |
ST CLAIR |
28 |
1
|
ASPHALT
|
$767,772 |
| 134 |
78B00 |
Signal modifications on IL 13 in Carbondale from Glenview Drive to McKinney Aven... |
09 |
JACKSON |
34 |
1
|
ELECTRICAL
|
$2.5M |
| 135 |
78B37 |
Bridge deck overlay and repairs on IL 14 over Fox River Slough, 5 miles east of ... |
09 |
WHITE |
42 |
4
|
TRAFFIC CONTROL
|
$436,549 (38/42) |
| 136 |
78B38 |
Bridge deck overlay s at 3 locations: 1) US 51 over Little Crab Orchard Creek, 2... |
09 |
JACKSON |
64 |
3
|
STRUCTURAL
|
$1.5M (62/64) |
| 137 |
78B52 |
Resurfacing on IL 37 from IL 15 to the north Mount Vernon city limits and on IL ... |
09 |
JEFFERSON |
88 |
2
|
ASPHALT
|
$5.0M (86/88) |
| 138 |
78B58 |
1.9 miles of patching and resurfacing on IL 148 from 0.8 miles south of the Fran... |
09 |
WILLIAMSON |
28 |
3
|
ASPHALT
|
$1.0M |
| 139 |
78B91 |
Traffic signal modernization at 2 intersections: IL 13 and Reed Station Road; IL... |
09 |
JACKSON |
29 |
1
|
ELECTRICAL
|
$517,576 |
| 140 |
80B25 |
(2.5-Mile) Standard Overlay, ADA Improvements, New Shoulders: Removing and repla... |
01 |
DUPAGE |
125 |
4
|
ASPHALT
|
$4.6M (124/125) |
| 141 |
80B56 |
Bridge Painting project consists of cleaning and painting designated steel surfa... |
01 |
COOK |
18 |
3
|
MISC & PRO SERVICES
|
$800,683 |
| 142 |
70D72 |
Culvert replacement at ditch 0.4 mile south of US 136 in Heyworth. |
05 |
MCLEAN |
41 |
2
|
UNDERGROUND
|
$772,611 |
| 143 |
80C91 |
FULL EXPRESSWAY CLEANING CYCLE and SUPPLEMENTAL SWEEPING includes the pickup, re... |
01 |
VARIOUS |
2 |
0
|
MISC & PRO SERVICES
|
$3.3M |
| 144 |
85769 |
Construction of PCC sidewalk and PCC shared-use path along IL 125 from River Lan... |
02 |
WINNEBAGO |
152 |
6
|
PCC FLATWORK
|
$4.1M (143/152) |
| 145 |
87886 |
A-1 Bituminous Surface Treatment on Cleveland Street from IL 89 to the BNSF Rail... |
03 |
BUREAU |
23 |
2
|
ASPHALT
|
$212,239 |
| 146 |
93842 |
Sidewalk construction at various locations within the City of Mt. Pulaski. |
06 |
LOGAN |
14 |
7
|
PCC FLATWORK
|
$365,240 |
| 147 |
97872 |
Reconstruction on Frank Scott Parkway East from Green Mount Road to Cross Street... |
08 |
ST CLAIR |
154 |
3
|
PCC FLATWORK
|
$4.8M (152/154) |
| 148 |
97877 |
Construction of a roundabout at the intersection of IL 162 and Troy Road in the ... |
08 |
MADISON |
118 |
3
|
PCC FLATWORK
|
$3.4M (117/118) |
| 149 |
97882 |
HMA resurfacing, curb and gutter replacement, sidewalk replacement, pavement mar... |
08 |
MADISON |
98 |
4
|
PCC FLATWORK
|
$2.5M (97/98) |
| 150 |
97886 |
HMA resurfacing of Old Collinsville Road from Ashland Avenue to US 50 in the Cit... |
08 |
ST CLAIR |
32 |
5
|
ASPHALT
|
$804,183 (28/32) |
| 151 |
97887 |
Construction of sidewalk and three curb bump-outs along North County Road and W.... |
08 |
ST CLAIR |
42 |
0
|
MISC & PRO SERVICES
|
$242,357 (41/42) |
| 152 |
99757 |
Construction of a roundabout intersection at Cambria Road and Cardinal Road/ Gra... |
09 |
WILLIAMSON |
68 |
4
|
PCC FLATWORK
|
$2.0M |
| 153 |
62W92 |
Replace old controllers, install new network switches, PTZ, integration to ATMS ... |
01 |
VARIOUS |
51 |
3
|
ELECTRICAL
|
$1.4M (48/51) |
| 154 |
64U03 |
19.3 miles, ultra-thin bonded wearing course, microsurfacing joint repairs, pave... |
02 |
LASALLE |
52 |
3
|
ASPHALT
|
$29.7M |
| 155 |
68J57 |
7.53 miles of resurfacing on IL 90/IL 91 from IL 91(N) in Princeville to IL 91(S... |
04 |
PEORIA |
86 |
2
|
ASPHALT
|
$7.9M (83/86) |
| 001A |
MO008 |
Rehabilitate and Reseal Eastern Apron |
04 |
WARREN |
15 |
0
|
MISC & PRO SERVICES
|
$203,652 (10/15) |
| 002A |
MO009 |
Rehabilitate Runway 3/21, Phase 1: Improve Runway Safety Area |
04 |
WARREN |
9 |
0
|
MISC & PRO SERVICES
|
$226,416 (7/9) |
| 003A |
SO087 |
Reconstruct Runway Lights on 18L/36R |
09 |
JACKSON |
21 |
0
|
MISC & PRO SERVICES
|
$762,120 (9/21) |
| 004A |
SP027 |
Rehabilitate Auto Parking Lot; Improve Airport Drainage; Install Security Fence |
08 |
RANDOLPH |
21 |
0
|
MISC & PRO SERVICES
|
$96,110 (8/21) |
| 005A |
IL035 |
Rehabilitate Runway 7/25, Remark Runway 18/36, and Remark Taxiways |
03 |
LASALLE |
8 |
0
|
ASPHALT
|
$1.3M (7/8) |