| 1 |
62K33 |
(2.03-Mile) The project includes widening and reconstruction of Barrington Road ... |
01 |
COOK |
335 |
7
|
EARTHWORK
|
$34.6M (318/335) |
| 2 |
62L85 |
(1,525-Ft) Standard Overlay consists of hot-mix asphalt pavement removal and rep... |
01 |
COOK |
92 |
1
|
ASPHALT
|
$1.0M (91/92) |
| 3 |
62P51 |
(3,935-Ft) Traffic Signal Modernization and lighting installation project consis... |
01 |
COOK |
254 |
4
|
ELECTRICAL
|
$5.5M (251/254) |
| 4 |
62V08 |
The work on this project consists of ditch regrading, culvert replacement, and v... |
01 |
COOK |
112 |
4
|
EARTHWORK
|
$2.1M (111/112) |
| 5 |
62V71 |
(3.87-Mile) Standard overlay and ADA curb ramp improvement project consists of h... |
01 |
WILL |
109 |
1
|
ASPHALT
|
$3.5M |
| 7 |
62X31 |
(650-Ft) Two culverts (SN 016-2290 and SN 099-0541) will undergo routine mainten... |
01 |
COOK |
22 |
2
|
MISC & PRO SERVICES
|
$270,999 |
| 8 |
62X44 |
This improvement consists of bridge deck concrete sealer upon the entire top sur... |
01 |
COOK |
11 |
2
|
TRAFFIC CONTROL
|
$827,630 |
| 9 |
62X57 |
(1.27-Mile) Design Overlay consists of pavement patching, resurfacing with polym... |
01 |
COOK |
68 |
2
|
ASPHALT
|
$1.8M |
| 10 |
62Y28 |
The work consists of furnishing all labor, materials, equipment, and other incid... |
01 |
COOK |
31 |
2
|
ELECTRICAL
|
$2.7M (26/31) |
| 11 |
62Y30 |
(190-Ft) Bridge Deck Overlay, Bridge Joint Replacement consists of scarify and o... |
01 |
COOK |
69 |
5
|
MISC & PRO SERVICES
|
$710,037 |
| 12 |
62Y31 |
Roadside development work shall consist of repairing, installing, and establishi... |
01 |
VARIOUS |
46 |
0
|
LANDSCAPE
|
$414,687 (41/46) |
| 13 |
62Y34 |
This work consists of applying selective and non-selective herbicide mixtures to... |
01 |
VARIOUS |
12 |
0
|
LANDSCAPE
|
$510,026 |
| 14 |
80B05 |
This improvement consists of class B patches, Diamond Grinding, ADA ramp improve... |
01 |
WILL |
57 |
3
|
PCC FLATWORK
|
$1.4M |
| 15 |
80B07 |
(1.52-Mile) Smart Overlay consists of hot-mix asphalt surface removal, pavement ... |
01 |
DUPAGE |
52 |
1
|
ASPHALT
|
$2.5M |
| 16 |
80B09 |
(9,682.91) Standard Overlay and ADA improvements project consists of (HMA) surfa... |
01 |
COOK |
113 |
1
|
ASPHALT
|
$4.9M |
| 17 |
80B10 |
(13,136-Ft) Smart Overlay project consists of milling of the existing hot-mix as... |
01 |
MCHENRY |
33 |
3
|
ASPHALT
|
$1.5M |
| 18 |
80B12 |
(705.72-Ft) HMA surface removal and overlaying consist of pavement patching, pav... |
01 |
MCHENRY |
56 |
1
|
PCC FLATWORK
|
$555,441 |
| 19 |
80B20 |
(2.42-Mile) PCC pavement patching improvement consists of Class B patches, and j... |
01 |
MCHENRY |
91 |
5
|
PCC FLATWORK
|
$2.1M (90/91) |
| 20 |
80B21 |
(3,373-Ft) Smart Overlay consists of (HMA) surface removal, (HMA) resurfacing, p... |
01 |
COOK |
140 |
5
|
ASPHALT
|
$3.8M |
| 21 |
80B26 |
This improvement consists of pavement patching, hot-mix asphalt surface removal ... |
01 |
COOK |
128 |
0
|
ASPHALT
|
$3.6M (126/128) |
| 22 |
80B27 |
(3.104-Mile) Designed and Smart Overlay and ADA improvements project consists of... |
01 |
COOK |
130 |
2
|
ASPHALT
|
$6.0M |
| 23 |
80B30 |
(2.3-Mile) Design Overlay and shoulder widening project includes HMA removal, ea... |
01 |
COOK |
121 |
1
|
ASPHALT
|
$4.5M |
| 24 |
80B31 |
Design Overlay and new Hot-Mix Asphalt Shoulder project includes hot-mix asphalt... |
01 |
WILL |
66 |
2
|
ASPHALT
|
$3.3M |
| 25 |
80B39 |
(4.42-Mile) Designed Overlay, standard overlay, and ADA improvements consists of... |
01 |
COOK |
103 |
1
|
ASPHALT
|
$6.2M |
| 26 |
80B46 |
(500-Ft) Bridge Repair and Bridge Deck Latex Overlay project consists of concret... |
01 |
WILL |
36 |
6
|
STRUCTURAL
|
$963,115 (35/36) |
| 27 |
80B48 |
(1,800-Ft) Bridge Deck Overlay includes hydro scarification of the existing brid... |
01 |
COOK |
69 |
5
|
MISC & PRO SERVICES
|
$827,639 (68/69) |
| 28 |
80B54 |
|
01 |
DUPAGE |
26 |
1
|
MISC & PRO SERVICES
|
$1.3M |
| 29 |
80B55 |
This improvement consists of bridge painting of the structures (Roosevelt Rd. ov... |
01 |
COOK |
8 |
1
|
MISC & PRO SERVICES
|
$844,006 |
| 30 |
80B62 |
(373.8-Ft) Bridge Deck latex concrete overlay, bridge and approach slab scarific... |
01 |
COOK |
62 |
6
|
STRUCTURAL
|
$1.2M (60/62) |
| 31 |
80B68 |
(13,313-Ft) This work consists of concrete surface removal, placement of HMA bin... |
01 |
DUPAGE |
98 |
1
|
ASPHALT
|
$5.3M |
| 32 |
80B76 |
(500-Ft) Project consists of the removal and replacement of a fixed platform sca... |
01 |
WILL |
71 |
3
|
ELECTRICAL
|
$1.1M (70/71) |
| 33 |
80B79 |
LITTER PICKING consists of the pickup, removal and satisfactory disposal of debr... |
01 |
COOK |
1 |
6
|
MISC & PRO SERVICES
|
$1.3M |
| 34 |
80B80 |
LITTER PICKING. The work to be done under Litter Picking shall consist of the pi... |
01 |
COOK |
1 |
6
|
MISC & PRO SERVICES
|
$359,908 |
| 35 |
80C49 |
(2.66-Mile) Designed Overlay, New shoulders, and curb ramps improvements consist... |
01 |
COOK |
121 |
1
|
ASPHALT
|
$4.9M |
| 36 |
80C85 |
(15,400-Ft) Roadway Reconstruction Project consists of pavement removal, earth e... |
01 |
MCHENRY |
345 |
7
|
PCC FLATWORK
|
$47.4M (336/345) |
| 37 |
80C91 |
|
01 |
VARIOUS |
2 |
1
|
MISC & PRO SERVICES
|
$3.2M |
| 38 |
80D22 |
The work to be performed and completed under this contract consists of pruning a... |
01 |
VARIOUS |
22 |
0
|
TREE REMOVAL
|
$1.2M |
| 39 |
61L48 |
Reconstruct and realign Kreutzer Road from east of IL 47 to Haligus Road in Hunt... |
01 |
MCHENRY |
215 |
3
|
EARTHWORK
|
$13.9M (214/215) |
| 40 |
61L54 |
HMA resurfacing of FAU 1447 (16th St.) from Harlem Ave. to Lombard Ave. in the C... |
01 |
COOK |
196 |
1
|
ELECTRICAL
|
$6.7M (193/196) |
| 41 |
61L84 |
HMA resurfacing of FAU 1379 (Fullerton Ave.) from Gary Ave. to Schmale Rd. in th... |
01 |
DUPAGE |
127 |
1
|
ASPHALT
|
$2.6M |
| 42 |
61L86 |
Construct a single-span PPC I-girder bridge with RC concrete deck to carry W. So... |
01 |
MCHENRY |
131 |
2
|
STRUCTURAL
|
$4.3M (125/131) |
| 43 |
61M11 |
Construct an HMA path adjacent to South Edgelawn Drive at the BNSF Railroad trac... |
01 |
KANE |
50 |
0
|
MISC & PRO SERVICES
|
$237,952 |
| 44 |
61M15 |
Construct a prefabricated truss bridge with approach spans to carry a shared-use... |
01 |
COOK |
163 |
5
|
STRUCTURAL
|
$6.5M (154/163) |
| 45 |
61M17 |
Reconstruction of TR 245 (Boyer Road) from Longmeadow Parkway to County Line Roa... |
01 |
KANE |
135 |
4
|
UNDERGROUND
|
$4.1M (129/135) |
| 46 |
61M33 |
Construction of a single-lane roundabout intersection at the intersection of Hig... |
01 |
KANE |
99 |
4
|
EARTHWORK
|
$1.5M (98/99) |
| 47 |
61M34 |
Resurfacing Brierwoods Lane from Lake Zurich City Limits to Bruce Circle N; Bruc... |
01 |
LAKE |
27 |
2
|
ASPHALT
|
$658,398 |
| 48 |
61M35 |
Construction of sidewalks along FAU 0006 (Marengo Rd.) and FAU 0005 (Ayer St.) i... |
01 |
MCHENRY |
57 |
0
|
MISC & PRO SERVICES
|
$419,983 (56/57) |
| 49 |
61M36 |
Resurfacing Mill Pond Drive from Schmale Road to Exchange Boulevard/President St... |
01 |
DUPAGE |
68 |
0
|
ASPHALT
|
$1.3M |
| 50 |
61M37 |
Resurfacing on North Grace Street from IL 64/North Avenue to East St. Charles Ro... |
01 |
DUPAGE |
99 |
0
|
ASPHALT
|
$2.3M (98/99) |
| 51 |
61M41 |
PCC sidewalk along Sheridan Road from Cedar Avenue to roger Williams Avenue in H... |
01 |
LAKE |
102 |
3
|
STRUCTURAL
|
$2.0M (98/102) |
| 53 |
46672 |
Placing various widths of Preformed Plastic and Modified Urethane pavement marki... |
02 |
VARIOUS |
12 |
1
|
PAVEMENT MARKINGS
|
$5.5M |
| 54 |
46675 |
Maintenance of signs along state maintained routes in District 2. |
02 |
VARIOUS |
8 |
2
|
TRAFFIC CONTROL
|
$871,858 |
| 55 |
64L51 |
3.98 miles of milling, Cold in Place recycling and HMA overlay from IL 84 from W... |
02 |
JODAVIESS |
40 |
1
|
ASPHALT
|
$3.7M |
| 56 |
64T06 |
Bridge repairs and joint replacement on SN's 071-0046/0047, carrying I-39 over I... |
02 |
OGLE |
65 |
2
|
STRUCTURAL
|
$4.3M (63/65) |
| 57 |
64T42 |
Bridge repairs and joint replacement on SN'S 089-0048, 089-0049, 089-0050, 089-0... |
02 |
STEPHENSON |
115 |
2
|
MISC & PRO SERVICES
|
$4.0M (114/115) |
| 58 |
64T73 |
2.32 miles US 30 to Wasson Rd in Amboy (designed overlay, cold milling), 0.80 mi... |
02 |
LEE |
55 |
1
|
ASPHALT
|
$2.2M |
| 59 |
64U85 |
1 mile of patching from Lowell Park Rd. to Fellows St. in Dixon. |
02 |
LEE |
19 |
3
|
PCC FLATWORK
|
$795,474 |
| 60 |
64U89 |
Bridge repairs, deck overlay and joint replacement on SN 101-0167, carrying US 2... |
02 |
WINNEBAGO |
52 |
3
|
MISC & PRO SERVICES
|
$506,691 (51/52) |
| 61 |
64U90 |
Bridge repairs, deck overlay and joint replacement on SN 101-0165, carrying IL 7... |
02 |
WINNEBAGO |
71 |
3
|
STRUCTURAL
|
$1.7M (70/71) |
| 62 |
64U93 |
Various routes on-call guardrail throughout District 2. |
02 |
VARIOUS |
35 |
2
|
FENCING & GUARDRAIL
|
$829,375 (34/35) |
| 63 |
64U99 |
Full cleaning and painting of SN 098-0065 and SN 098-0055. |
02 |
WHITESIDE |
15 |
1
|
MISC & PRO SERVICES
|
$488,087 |
| 64 |
64V32 |
1 mile of patching from Lowell Park Rd. to Fellows St. in Dixon. |
02 |
VARIOUS |
10 |
0
|
ELECTRICAL
|
$126,873 (9/10) |
| 65 |
64V38 |
Overhead sign structure installation on IL 251, 0.3 miles south of Landstrom Rd. |
02 |
WINNEBAGO |
13 |
2
|
FENCING & GUARDRAIL
|
$307,407 |
| 66 |
64V43 |
Concrete sealer applied to the deck of SN 098-6003, carrying US 30 over the Miss... |
02 |
WHITESIDE |
3 |
1
|
TRAFFIC CONTROL
|
$98,924 |
| 67 |
85792 |
Cold-In-Place Recycling on Orangeville Road from McConnell Road to 0.3 miles eas... |
02 |
STEPHENSON |
7 |
0
|
ASPHALT
|
$1.4M |
| 68 |
85793 |
Resurfacing on Brooklyn Road from US 30 to IL 251. |
02 |
LEE |
14 |
1
|
ASPHALT
|
$2.4M |
| 69 |
85797 |
Replace the bridge carrying Indian Head Road over Red Oak Ditch. |
02 |
LEE |
30 |
1
|
STRUCTURAL
|
$656,938 |
| 70 |
85798 |
Rehabilitation of the Rock River Bridge carring Roscoe Road over the Rock River ... |
02 |
WINNEBAGO |
60 |
1
|
STRUCTURAL
|
$5.3M |
| 71 |
46671 |
Repairing various widths of pavement marking including lines, letters, numbers, ... |
03 |
VARIOUS |
37 |
1
|
PAVEMENT MARKINGS
|
$2.5M |
| 72 |
66M03 |
|
03 |
BUREAU |
79 |
1
|
STRUCTURAL
|
$1.5M (78/79) |
| 73 |
66M55 |
Bridge Replacement (SN 050-0033) over the Fox River in Ottawa IL and milling and... |
03 |
LASALLE |
264 |
0
|
STRUCTURAL
|
$12.1M (252/264) |
| 74 |
66N58 |
Rehabilitation of SN 032-0025, carrying US 6 over Aux Sable Creek in Grundy Coun... |
03 |
GRUNDY |
88 |
1
|
STRUCTURAL
|
$1.8M |
| 75 |
66P68 |
6.04 mi of 1.5" milling and hot-mix asphalt surface course pavement rehabilitati... |
03 |
IROQUOIS |
89 |
1
|
ASPHALT
|
$2.6M |
| 76 |
66P86 |
5.75 miles of milling and HMA resurfacing of US 6/34 with 3-4 foot aggregate wed... |
03 |
BUREAU |
110 |
1
|
ASPHALT
|
$3.9M (107/110) |
| 77 |
66R50 |
Milling and resurfacing (designed overlay) with new shoulders and rumble strip. ... |
03 |
IROQUOIS |
70 |
1
|
ASPHALT
|
$5.8M |
| 78 |
66R61 |
Scour repair, Deck/Approach, patching, Joint replacement, Slope wall repair and ... |
03 |
IROQUOIS |
37 |
2
|
TRAFFIC CONTROL
|
$259,912 (36/37) |
| 79 |
66R63 |
Joint replacement, Deck patch, approach repairs, Beam end repairs, bearing retai... |
03 |
BUREAU |
49 |
2
|
TRAFFIC CONTROL
|
$453,300 |
| 80 |
66R64 |
Joint replacement, Deck patch, approach repairs, bearing retainer and paint, sub... |
03 |
LASALLE |
55 |
1
|
TRAFFIC CONTROL
|
$502,427 |
| 81 |
66R66 |
Joint replacement, deck patch, substructure repairs, Anti-Graffiti_at structure ... |
03 |
FORD |
50 |
3
|
TRAFFIC CONTROL
|
$393,152 |
| 82 |
66R68 |
Joint replacement, bearing replacement, deck and approach patch, HMA shoulder an... |
03 |
KANKAKEE |
41 |
2
|
STRUCTURAL
|
$504,732 |
| 83 |
66R69 |
Joint replacement, deck and approach patching at structure No. 006-0084 carrying... |
03 |
BUREAU |
36 |
2
|
TRAFFIC CONTROL
|
$369,194 (35/36) |
| 84 |
66T17 |
Work consists of intermittent HMA milling and resurfacing, pavement marking, rai... |
03 |
KANKAKEE |
33 |
2
|
ASPHALT
|
$2.0M |
| 85 |
66T25 |
Replacing the existing high mast tower lighting with 45 ft. light poles at I-180... |
03 |
BUREAU |
18 |
1
|
ELECTRICAL
|
$397,494 |
| 86 |
66T32 |
Herbicide, seeding, landscaping, and maintenance for this pollinator project loc... |
03 |
LIVINGSTON |
7 |
0
|
LANDSCAPE
|
$826,350 (6/7) |
| 87 |
66T58 |
Routing and filling the cracks along the centerline, significant transverse crac... |
03 |
LASALLE |
7 |
2
|
ASPHALT
|
$129,462 |
| 88 |
87893 |
Construct a three-span PPC deck beam bridge to carry Rice Road over East Fork Ma... |
03 |
GRUNDY |
66 |
1
|
STRUCTURAL
|
$2.7M |
| 89 |
87899 |
Reconstruction of Ridge Road to an HMA four-lane from Holt Road to Black Road. I... |
03 |
KENDALL |
281 |
3
|
EARTHWORK
|
$40.5M (272/281) |
| 90 |
87900 |
Resurfacing Kangley Road from the LaSalle County line to IL 17. |
03 |
LIVINGSTON |
13 |
1
|
ASPHALT
|
$842,806 |
| 91 |
87907 |
Sidewalk construction along East North Street, North Jackson Street, and East Wa... |
03 |
GRUNDY |
14 |
0
|
PCC FLATWORK
|
$268,927 |
| 92 |
87909 |
Sidewalk construction and ADA ramps on various routes near Marseilles Elementary... |
03 |
LASALLE |
27 |
0
|
PCC FLATWORK
|
$338,482 |
| 93 |
68H43 |
Bridge deck sealing at various locations within District 4. |
04 |
VARIOUS |
7 |
0
|
TRAFFIC CONTROL
|
$410,618 |
| 94 |
68J16 |
Bridge joint replace and repair, bridge deck overlay, slope wall repair at SN 09... |
04 |
TAZEWELL |
25 |
3
|
MISC & PRO SERVICES
|
$438,642 (24/25) |
| 95 |
68J47 |
Crack and joint sealing on various routes in various couties in District 4. |
04 |
VARIOUS |
12 |
2
|
PAVEMENT MARKINGS
|
$1.1M |
| 96 |
68J60 |
5.86 miles of CIR and design overlay of IL 122 from 2.1 miles east of Hopedale t... |
04 |
TAZEWELL |
50 |
1
|
ASPHALT
|
$7.7M |
| 97 |
68J88 |
3.49 miles of resurfacing of IL 8 (W. Southport Rd) from 0.7 mile east of Taylor... |
04 |
PEORIA |
47 |
2
|
ASPHALT
|
$3.7M |
| 98 |
68J89 |
6.5 miles of resurfacing and cold in-place recycling on IL 8 from Texas Rd to Ta... |
04 |
PEORIA |
51 |
2
|
ASPHALT
|
$6.8M |
| 99 |
68J95 |
8.4 miles of CIR and design overlay of IL 17 from the eastern city limits of Lac... |
04 |
MARSHALL |
56 |
1
|
ASPHALT
|
$9.0M |
| 100 |
68K12 |
5.656 gross miles of microsurfacing on I-474/US 24 from the Illinois River to I-... |
04 |
TAZEWELL |
35 |
2
|
ASPHALT
|
$2.8M |
| 101 |
68K17 |
9.93 miles of 3P resurfacing on US Route 24 from Izaack Walton Road to North of ... |
04 |
FULTON |
66 |
1
|
ASPHALT
|
$9.0M |
| 102 |
68K20 |
6.45 miles of resurfacing from the southern city limit of Bradford to the west l... |
04 |
STARK |
76 |
1
|
ASPHALT
|
$2.8M |
| 103 |
68K22 |
Bridge repairs on IL 26, south of IL 17:SN 102-0067 over Snag Creek, SN 102-0064... |
04 |
WOODFORD |
66 |
3
|
MISC & PRO SERVICES
|
$1.8M (65/66) |
| 104 |
68K23 |
5.84 miles of 3P resurfacing on US 34 in Knox County from 0.4 mile west of Inter... |
04 |
KNOX |
55 |
1
|
ASPHALT
|
$9.9M |
| 105 |
68K33 |
5.93 mile SMART project consisting of resurfacing, replacing guardrail, patching... |
04 |
MERCER |
40 |
0
|
ASPHALT
|
$2.3M |
| 107 |
68K54 |
Pavement marking throughout District 4. |
04 |
VARIOUS |
4 |
1
|
PAVEMENT MARKINGS
|
$3.2M |
| 108 |
68K86 |
Removal and replacement of various installations of guardrail in District 4 alon... |
04 |
HENDERSON |
10 |
2
|
FENCING & GUARDRAIL
|
$610,972 |
| 109 |
68K87 |
Fence removal and replacement around Operations Yard in Morton. |
04 |
TAZEWELL |
5 |
1
|
FENCING & GUARDRAIL
|
$148,728 (3/5) |
| 110 |
68K89 |
8.9 miles of partial and full depth patching on Illinois Route 29 (FAP 318) begi... |
04 |
MARSHALL |
10 |
3
|
PCC FLATWORK
|
$867,896 |
| 111 |
68L05 |
Building demolition at 600 Main St (Parcel No. 4ABL011) in East Peoria, Tazewell... |
04 |
TAZEWELL |
6 |
4
|
TRAFFIC CONTROL
|
$107,689 |
| 112 |
89844 |
Replace the bridge carrying Berlin Road over Camp Creek, 0.4 mile north of Belli... |
04 |
MCDONOUGH |
60 |
1
|
STRUCTURAL
|
$2.3M |
| 113 |
89871 |
Construct a three-span PPC deck beam structure to carry CH 15 over Lone Tree Dit... |
04 |
HENDERSON |
50 |
0
|
STRUCTURAL
|
$1.9M |
| 114 |
89898 |
Resurfacing on Broadway Road from Springfield Road to the I-55 Interchange. |
04 |
TAZEWELL |
18 |
1
|
ASPHALT
|
$3.0M |
| 115 |
70574 |
Remove and replace existing structure SN 057-0077 on FAP 693 IL. 9 with proposed... |
05 |
MCLEAN |
46 |
1
|
UNDERGROUND
|
$555,970 |
| 116 |
70E14 |
SMART/Standard Overlay resurfacing project on FAI-74 from 0.4 mi E of US 51 Bus ... |
05 |
MCLEAN |
61 |
1
|
ASPHALT
|
$12.6M |
| 117 |
70E82 |
Patching FAI 39 (I-39) ramps at Hudson interchange. Approximately 1.825 miles gr... |
05 |
MCLEAN |
63 |
1
|
ASPHALT
|
$4.2M |
| 118 |
70F20 |
Remove and reconstruct FAP 693 (ILL 9, US 150) from east of Main St Ave to Towan... |
05 |
MCLEAN |
149 |
1
|
PCC FLATWORK
|
$10.1M |
| 119 |
70H72 |
Wing wall repair at Kickapoo Pond 0.2 mi west of Skykine Dr. west of Tilton. |
05 |
VERMILION |
8 |
2
|
MISC & PRO SERVICES
|
$410,506 |
| 120 |
70H82 |
0.01 mi patching FAI 39 (I-39) ramps at Hudson Interchange. |
05 |
MCLEAN |
20 |
3
|
PCC FLATWORK
|
$616,962 (19/20) |
| 121 |
70H85 |
2.19 Miles of Patching from Fox Creek Road to N of Washington St. in Bloomington... |
05 |
MCLEAN |
14 |
3
|
PCC FLATWORK
|
$987,507 |
| 122 |
70H87 |
9.178 Miles of Mircosurfacing Joint Repair on I-72 from Bridge St in Monticello ... |
05 |
PIATT |
12 |
2
|
PAVEMENT MARKINGS
|
$518,951 |
| 123 |
91652 |
|
05 |
VERMILION |
31 |
1
|
STRUCTURAL
|
$445,365 |
| 124 |
72296 |
Bridge deck overlay on SN 054-0102 carrying Old IL 121 over Sugar Creek, 2.5 mil... |
06 |
LOGAN |
31 |
3
|
MISC & PRO SERVICES
|
$1.4M |
| 125 |
72348 |
5.7 miles of resurfacing on IL 54 from 0.2 miles east of Prairie School Road to ... |
06 |
SANGAMON |
63 |
2
|
ASPHALT
|
$6.4M |
| 126 |
72441 |
2.5 miles of resurfacing on IL 121 from 0.2 miles west of CH 6 (west of Latham) ... |
06 |
LOGAN |
34 |
2
|
ASPHALT
|
$2.2M |
| 127 |
72443 |
2 miles of resurfacing on Armington Road (US 136 Spur) from East Third Street in... |
06 |
LOGAN |
21 |
1
|
ASPHALT
|
$613,711 |
| 128 |
72503 |
Drainage improvements at the intersection of Old US 36 and Mt. Pulaski Road. |
06 |
SANGAMON |
15 |
3
|
TRAFFIC CONTROL
|
$232,684 |
| 129 |
72511 |
Bridge deck patching and curb repairs on SN 075-0139 carrying IL 96 over Walnut ... |
06 |
PIKE |
14 |
5
|
TRAFFIC CONTROL
|
$198,998 |
| 130 |
72636 |
Maintenance and repair of surveillance cameras, vehicle detectors, dynamic messa... |
06 |
VARIOUS |
10 |
3
|
ELECTRICAL
|
$132,952 |
| 131 |
72638 |
0.1 miles of resurfacing on the IL 29 spur west of Hilltop Road; east of Springf... |
06 |
SANGAMON |
7 |
2
|
TRAFFIC CONTROL
|
$108,722 |
| 132 |
72669 |
Bridge deck overlay, bridge repairs, and bridge painting on SN 059-0049 carrying... |
06 |
MACOUPIN |
43 |
2
|
MISC & PRO SERVICES
|
$1.5M |
| 133 |
72741 |
Drainage improvements on Old US 36 west of Illiopolis. |
06 |
SANGAMON |
32 |
3
|
TRAFFIC CONTROL
|
$420,692 (31/32) |
| 134 |
72B63 |
9.1 miles of pavement patching, HMA surface removal, HMA surfacing, entrance rec... |
06 |
ADAMS |
35 |
1
|
ASPHALT
|
$4.7M |
| 136 |
72E74 |
Railroad interconnects on IL 57 at Radio Road south of Qunicy and on IL 108 at S... |
06 |
ADAMS |
7 |
1
|
TRAFFIC CONTROL
|
$178,763 |
| 137 |
72E75 |
Bridge painting on portions of two bridges on US 24 and IL 57 near Quincy. (SN 0... |
06 |
ADAMS |
7 |
0
|
MISC & PRO SERVICES
|
$462,230 |
| 138 |
72F51 |
Maintenance and repair of traffic signals, flashing beacons and roadway lighting... |
06 |
VARIOUS |
47 |
2
|
ELECTRICAL
|
$505,937 |
| 139 |
72F52 |
Maintenance and repair of traffic signals, flashing beacons and roadway lighting... |
06 |
VARIOUS |
47 |
2
|
ELECTRICAL
|
$275,343 |
| 140 |
72N43 |
Expansion of the Emergency Vehicle Operations Course (EVOC) at the Illinois Stat... |
06 |
SANGAMON |
165 |
3
|
PCC FLATWORK
|
$10.8M (152/165) |
| 141 |
93783 |
HMA resurfacing on South Diamond Street from Greenwood Avenue to Michigan Avenue... |
06 |
MORGAN |
68 |
1
|
UNDERGROUND
|
$1.4M |
| 142 |
93850 |
Construct PCC sidewalk with ADA ramps along State Street and Taylor Aveue from t... |
06 |
MONTGOMERY |
18 |
2
|
PCC FLATWORK
|
$395,351 |
| 143 |
74433 |
[DELETED] Replacement of SN 012-0014 carrying IL 1 over the CSX Railroad, 0.5 mi... |
07 |
CLARK |
148 |
0
|
STRUCTURAL
|
$13.8M (146/148) |
| 144 |
74435 |
Reconstructing the I-57 and IL 16 interchange located east of Mattoon from a clo... |
07 |
COLES |
356 |
3
|
EARTHWORK
|
$56.4M (351/356) |
| 145 |
74650 |
Superstructure replacement and bridge widening of 2 structures on I-57 over IC R... |
07 |
COLES |
128 |
0
|
STRUCTURAL
|
$12.5M (127/128) |
| 147 |
74856 |
Bridge replacement on US 36/IL 121 over Lake Shore Drive in Decatur. (SN 058-001... |
07 |
MACON |
103 |
2
|
STRUCTURAL
|
$4.7M (102/103) |
| 148 |
74D08 |
Bridge joint replacement, bridge deck patching, bridge deck scarification, bridg... |
07 |
MACON |
69 |
2
|
MISC & PRO SERVICES
|
$6.6M |
| 149 |
74D10 |
2.4 miles of resurfacing and aggregate wedge shoulder on US 51 from 0.5 miles so... |
07 |
FAYETTE |
22 |
1
|
ASPHALT
|
$1.1M |
| 150 |
74D56 |
7.4 miles of crack and joint sealing on I-70 from 1 mile west of US 40 at Browns... |
07 |
FAYETTE |
6 |
1
|
ASPHALT
|
$552,940 |
| 151 |
74D60 |
Installation of fencing at the Fayette County Maintenance Storage Facility. |
07 |
FAYETTE |
3 |
1
|
FENCING & GUARDRAIL
|
$154,442 |
| 152 |
74D61 |
Painting of 14 bridges on various routes in various counties of District 7. |
07 |
VARIOUS |
38 |
1
|
MISC & PRO SERVICES
|
$3.3M |
| 153 |
74D63 |
Cleaning and painting 4 bridges carrying various routes over I-64. (SN 096-0036,... |
07 |
WAYNE |
17 |
1
|
MISC & PRO SERVICES
|
$966,908 |
| 154 |
74E17 |
12.9 miles of tree removal along IL 1 from 0.2 miles south of Empire Street to 0... |
07 |
EDWARDS |
5 |
2
|
TREE REMOVAL
|
$431,661 |
| 155 |
74E18 |
3.5 miles of milling and resurfacing on IL 105/IL 121 from north of Eldorado Str... |
07 |
MACON |
18 |
1
|
ASPHALT
|
$649,690 |
| 156 |
74E19 |
3.6 miles of patching on IL 48, IL 121 from north of Cundiff Road to 0.3 miles s... |
07 |
MACON |
17 |
2
|
PCC FLATWORK
|
$1.2M |
| 157 |
74E20 |
8.9 miles of patching on US 50 from the Embarrass River to IL 33 and on IL 33 fr... |
07 |
LAWRENCE |
13 |
3
|
PCC FLATWORK
|
$543,339 |
| 158 |
74E22 |
0.3 miles of resurfacing, aggregate wedge shoulder and HMA shoulders on IL 1 sou... |
07 |
CRAWFORD |
29 |
1
|
TRAFFIC CONTROL
|
$264,698 |
| 159 |
74E23 |
Tree removal on IL 33 in Crawford and Lawrence Counties. |
07 |
CRAWFORD |
5 |
2
|
TREE REMOVAL
|
$385,970 |
| 160 |
74E24 |
10.6 miles of shoulder reconstruction on IL 33 from IL 130 to the Crawford Count... |
07 |
JASPER |
4 |
3
|
EARTHWORK
|
$366,718 |
| 161 |
74E25 |
Chip seal at 3 locations on Old US 50: 1) from IL 250 to Suntone Road; 2) 0.4 mi... |
07 |
RICHLAND |
8 |
1
|
ASPHALT
|
$664,266 (7/8) |
| 162 |
74E29 |
Washing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in M... |
07 |
WABASH |
4 |
0
|
MISC & PRO SERVICES
|
$133,463 |
| 163 |
74E31 |
Repairing, replacing, servicing and maintaining the electrical systems in good o... |
07 |
VARIOUS |
40 |
1
|
ELECTRICAL
|
$404,985 (39/40) |
| 164 |
95A04 |
Replace existing aggregate shoulder with HMA shoulder with rumble strips on St. ... |
07 |
RICHLAND |
9 |
2
|
ASPHALT
|
$3.5M |
| 165 |
95A07 |
Construct HMA shoulders with rumble strips, and replace the existing pipe culver... |
07 |
LAWRENCE |
16 |
1
|
ASPHALT
|
$1.2M |
| 166 |
95A08 |
HMA resurfacing on CH 13 from CR 600 N to CR 875 N in Wayne County. Includes; ag... |
07 |
WAYNE |
19 |
2
|
ASPHALT
|
$1.3M |
| 167 |
46670 |
Pavement marking replacement at various locations in Jersey, Madison and St. Cla... |
08 |
JERSEY |
7 |
1
|
PAVEMENT MARKINGS
|
$280,199 |
| 168 |
76M95 |
Resurfacing on I-64 from 0.5 miles west of Beaver Pond Creek to 0.9 miles west o... |
08 |
WASHINGTON |
125 |
5
|
ASPHALT
|
$90.3M (122/125) |
| 169 |
76N37 |
4 miles of resurfacing on IL 160 / IL 177 from the Clinton County line to the we... |
08 |
WASHINGTON |
40 |
2
|
ASPHALT
|
$4.7M |
| 170 |
76R78 |
Modernization of eight traffic signals along the IL 159 corridor in Fairview Hei... |
08 |
ST CLAIR |
79 |
1
|
ELECTRICAL
|
$2.4M (78/79) |
| 171 |
76U41 |
9.7 miles of resurfacing on IL 100/IL 16 from IL 96 in Kampsville to IL 16 in Ha... |
08 |
CALHOUN |
46 |
2
|
ASPHALT
|
$5.9M |
| 172 |
76U53 |
Lighting and traffic signal modernization at various locations in District 8. |
08 |
VARIOUS |
108 |
1
|
ELECTRICAL
|
$2.9M (90/108) |
| 173 |
76U66 |
21.4 miles of underdrain cleaning and headwall replacement on IL 255 from I-270 ... |
08 |
MADISON |
9 |
2
|
UNDERGROUND
|
$1.5M (8/9) |
| 174 |
76U70 |
15.5 miles of patching on US 67 from Cain Street in Roodhouse to Jack Pine Drive... |
08 |
GREENE |
13 |
3
|
PCC FLATWORK
|
$1.2M |
| 175 |
76U75 |
Milling and resurfacing the bridge approach for SN 082-0305 carrying IL 163 over... |
08 |
ST CLAIR |
16 |
2
|
TRAFFIC CONTROL
|
$176,615 |
| 176 |
76U79 |
1 mile of chip seal / fog seal on Bunkum Road from 37th Street in East St. Louis... |
08 |
ST CLAIR |
15 |
1
|
TRAFFIC CONTROL
|
$253,236 |
| 177 |
76U84 |
Bridge painting on SN 060-0215 carrying Fairmont Avenue over I-255. |
08 |
MADISON |
9 |
1
|
MISC & PRO SERVICES
|
$480,545 |
| 178 |
76U85 |
Bridge painting on SN 060-0213 carrying IL 3 over IL 140 in Alton. |
08 |
MADISON |
8 |
1
|
MISC & PRO SERVICES
|
$452,910 |
| 179 |
76U87 |
Bridge painting on SN 060-0073 carrying IL 140 over I-55 in Hamel and SN 060-007... |
08 |
MADISON |
13 |
1
|
MISC & PRO SERVICES
|
$603,192 |
| 180 |
76U93 |
0.9 miles of Bureau of Research test pavement alongside US 50 from Crackerneck R... |
08 |
CLINTON |
4 |
2
|
MISC & PRO SERVICES
|
$91,446 (3/4) |
| 181 |
76V05 |
55.2 miles of patching on IL 3 from the Monroe County line to the Jackson County... |
08 |
RANDOLPH |
19 |
7
|
PCC FLATWORK
|
$1.7M (17/19) |
| 182 |
76V07 |
9.4 miles of patching on IL 157 from IL 163 to the Madison County line and on Fo... |
08 |
ST CLAIR |
26 |
4
|
PCC FLATWORK
|
$1.6M |
| 183 |
76V10 |
24.5 miles of patching on I-57 from 0.7 miles north of IL 161 to the Fayette Cou... |
08 |
MARION |
14 |
6
|
PCC FLATWORK
|
$2.1M |
| 184 |
76V14 |
Various types of patching on State-maintained roads within various counties of D... |
08 |
VARIOUS |
30 |
4
|
TRAFFIC CONTROL
|
$2.0M (29/30) |
| 185 |
97877 |
Construction of a roundabout at the intersection of IL 162 and Troy Road in the ... |
08 |
MADISON |
118 |
0
|
PCC FLATWORK
|
$3.5M (117/118) |
| 186 |
97808 |
Resurfacing on Longacre Drive from Union Hill Road to IL 159 in Fairview Heights... |
08 |
ST CLAIR |
57 |
1
|
ASPHALT
|
$1.3M |
| 187 |
97827 |
Construct a southbound right-turn lane at the intersection of Old Collinsville R... |
08 |
ST CLAIR |
92 |
3
|
PCC FLATWORK
|
$441,220 (90/92) |
| 188 |
97840 |
HMA resurfacing, patching, sidewalks, curb and gutter on Wood River Avenue from ... |
08 |
MADISON |
98 |
2
|
PCC FLATWORK
|
$1.1M |
| 189 |
97865 |
Sidewalk construction on various streets in Millstadt. |
08 |
ST CLAIR |
56 |
4
|
PCC FLATWORK
|
$863,375 |
| 190 |
97887 |
Construction of sidewalks and three curb bump-outs along North County Road and W... |
08 |
ST CLAIR |
42 |
3
|
MISC & PRO SERVICES
|
$250,650 (41/42) |
| 191 |
78495 |
Replacement of existing box culverts (SN 041-7065 and 041-7066) carrying IL 15 o... |
09 |
JEFFERSON |
47 |
2
|
UNDERGROUND
|
$735,947 |
| 193 |
78A24 |
Slope repair near the intersection of IL 127 and Chestnut Street in Alto Pass. |
09 |
UNION |
18 |
2
|
MISC & PRO SERVICES
|
$1.2M |
| 195 |
78B36 |
Joint replacement, repairs and overlay on SN 028-0020 carrying IL 14 over the Bi... |
09 |
FRANKLIN |
50 |
2
|
STRUCTURAL
|
$1.8M (47/50) |
| 196 |
78B45 |
Bridge work at 2 locations on IL 127: 1) Joint reconstruction/elimination and HM... |
09 |
ALEXANDER |
40 |
2
|
TRAFFIC CONTROL
|
$609,506 |
| 197 |
78B46 |
Bridge deck overlay with partial and full depth patching on SN 033-0041 carrying... |
09 |
HAMILTON |
28 |
2
|
TRAFFIC CONTROL
|
$464,851 |
| 198 |
78B47 |
Bridge overlay on SN 100-0070 carrying IL 166 over South Fork Saline River. |
09 |
WILLIAMSON |
28 |
2
|
TRAFFIC CONTROL
|
$338,260 |
| 199 |
78B48 |
Bridge deck overlay on SN 077-0037 carrying IL 37 over Hodges Bayou; on SN 077-0... |
09 |
MASSAC |
34 |
2
|
MISC & PRO SERVICES
|
$905,718 |
| 200 |
78B50 |
Substructure repairs on SN 077-0002 carrying I-57 southbound over Old US 51 in P... |
09 |
PULASKI |
15 |
2
|
STRUCTURAL
|
$865,381 |
| 201 |
78B79 |
Removal of existing stop sign panel assemblies and furnishing / installing new s... |
09 |
VARIOUS |
4 |
3
|
ELECTRICAL
|
$169,512 |
| 202 |
78B86 |
Repairs on SN 064-0036 carrying US 45 over Massac Creek, 1.5 miles west of I-24. |
09 |
MASSAC |
25 |
2
|
STRUCTURAL
|
$215,979 |
| 203 |
78B87 |
Joint repairs, wingwall repairs and bridge deck overlay on SN 083-0052 and 083-0... |
09 |
SALINE |
25 |
2
|
STRUCTURAL
|
$423,268 |
| 204 |
78C09 |
Resurfacing on Old US 45 beginning at US 45 and proceeding 0.47 miles to the nor... |
09 |
JOHNSON |
9 |
1
|
ASPHALT
|
$212,131 |
| 205 |
99761 |
Reconstruction of South Market Street from Boyton Street to 0.1 mile south of Te... |
09 |
WILLIAMSON |
66 |
2
|
ASPHALT
|
$797,449 (65/66) |
| 206 |
99764 |
HMA overlay and shoulders on Shawnee College Road from Old US 51 to IL 37. |
09 |
PULASKI |
28 |
2
|
ASPHALT
|
$4.4M (27/28) |
| 207 |
99767 |
Resurfacing on North Thompsonville Road from Akin Blacktop to IL 34, north of Th... |
09 |
FRANKLIN |
13 |
2
|
ASPHALT
|
$1.4M |
| 208 |
99768 |
Hot-In-PLace recycling, HMA surface, and aggregate shoulders on East Park Street... |
09 |
PERRY |
14 |
2
|
ASPHALT
|
$709,994 (12/14) |
| 209 |
46948 |
HMA resurfacing of roadway and parking lots, striping of parking lots, culvert r... |
07 |
MACON |
98 |
1
|
ASPHALT
|
$1.5M (95/98) |
| 001A |
DU096 |
Construct Service Road: Flight Center to South Apron |
01 |
DUPAGE |
30 |
2
|
MISC & PRO SERVICES
|
$212,658 (20/30) |
| 002A |
CR008 |
Replace Rotating Beacon, Wind Cone, PAPI, and Runway 36 REILs; Install Runway 18... |
09 |
WHITE |
15 |
1
|
MISC & PRO SERVICES
|
$336,074 (8/15) |
| 003A |
LK017 |
Construct Apron: West Terminal Area, Phase 1 |
01 |
MCHENRY |
36 |
3
|
EARTHWORK
|
$338,890 (20/36) |
| 004A |
SD065 |
Relocate/Reconstruct Taxiway B, Phase 4: Construct from Taxiway B1 to B4 |
08 |
ST CLAIR |
60 |
3
|
EARTHWORK
|
$2.8M (32/60) |
| 005A |
SO088 |
Remark Runway 18L/36R and Remark Taxiway A, A1, A2, B, G, H, and J |
09 |
JACKSON |
5 |
1
|
PAVEMENT MARKINGS
|
$266,657 (4/5) |
| 006A |
DK067 |
Rehabilitate Taxiway B - Construction |
03 |
DEKALB |
19 |
1
|
ASPHALT
|
$792,828 (17/19) |
| 007A |
GR014 |
Reconstruct Runway 18 Visual Guidance System, Install Runway 36 Visual Guidance ... |
08 |
BOND |
10 |
1
|
MISC & PRO SERVICES
|
$160,163 (5/10) |
| 008A |
MB037 |
Reconstruct Access Taxilanes |
04 |
MCDONOUGH |
21 |
1
|
MISC & PRO SERVICES
|
$191,967 (15/21) |
| 009A |
RB024 |
Reconstruct Airport Lighting Vault Equipment and Rehabilitate Airport Rotating B... |
07 |
CRAWFORD |
15 |
1
|
MISC & PRO SERVICES
|
$425,561 (7/15) |
| 010A |
CA025 |
Rehabilitate Runway 13/31, Reconstruct Lighting and Signage - Construction Phase... |
06 |
SANGAMON |
89 |
2
|
UNDERGROUND
|
$0.00 (0/89) |