| 1 |
46952 |
(2.69-Mile) Project consists of resurfacing William Powers State Park roadways, ... |
01 |
COOK |
109 |
2
|
ASPHALT
|
$2.3M (107/109) |
| 2 |
62M71 |
(3.59-Mile) Roadway Reconstruction project on a new shifted alignment consists o... |
01 |
KANE |
420 |
12
|
EARTHWORK
|
$69.6M (393/420) |
| 3 |
62R61 |
(710.53-Ft) Bridge Replacement and widening project (SN 016-2015) include paveme... |
01 |
COOK |
291 |
7
|
STRUCTURAL
|
$22.8M (268/291) |
| 4 |
62T46 |
(350.89-Ft) Bridge Deck Overlay consists of Bridge Joint Replace, bearing and Su... |
01 |
COOK |
42 |
6
|
MISC & PRO SERVICES
|
$517,224 (41/42) |
| 5 |
62U72 |
(8,360-Ft) Roadway add lanes and reconstruction project consists of pavement rem... |
01 |
MCHENRY |
409 |
9
|
UNDERGROUND
|
$47.0M (402/409) |
| 6 |
62V63 |
(0.895-Mile) Project consists of cleaning and sealing of longitudinal joints bet... |
01 |
MCHENRY |
17 |
3
|
TRAFFIC CONTROL
|
$380,085 (16/17) |
| 7 |
62V77 |
(9,669-Ft) Crack and Joint Sealing project consists of routing, cleaning, and se... |
01 |
LAKE |
18 |
3
|
TRAFFIC CONTROL
|
$359,730 |
| 8 |
62V78 |
(1.31-Mile) This is a crack and joint sealant improvement consisting of routing ... |
01 |
DUPAGE |
32 |
3
|
PCC FLATWORK
|
$662,439 |
| 9 |
62W82 |
This project proposes converting the entire closed loop system into a centralize... |
01 |
VARIOUS |
53 |
4
|
ELECTRICAL
|
$3.9M (45/53) |
| 10 |
62W83 |
This project adds 35 traffic signals into the Central Traffic Management System ... |
01 |
COOK |
54 |
4
|
ELECTRICAL
|
$2.1M (50/54) |
| 11 |
62W91 |
This project proposes adding 10 traffic signals into the Central Traffic Managem... |
01 |
COOK |
50 |
4
|
ELECTRICAL
|
$1.3M (44/50) |
| 12 |
62W99 |
The work consists of furnishing all labor, materials, equipment, and other incid... |
01 |
COOK |
201 |
7
|
ASPHALT
|
$23.5M (196/201) |
| 13 |
62X28 |
(1,079.50-Ft) Bridge Joint replace/repair culvert repair, and wing wall and abut... |
01 |
WILL |
27 |
5
|
MISC & PRO SERVICES
|
$295,934 |
| 14 |
62X37 |
(4.25-Mile) Furnishing and installing landscaping along I-80 corridor from Gardn... |
01 |
WILL |
84 |
1
|
LANDSCAPE
|
$2.7M (74/84) |
| 15 |
62X52 |
The project consists of a full depth patching of the top slab over the culvert a... |
01 |
DUPAGE |
48 |
7
|
MISC & PRO SERVICES
|
$343,891 |
| 16 |
80B17 |
(2,809-Ft) Smart Overlay consists of thermoplastic pavement markings, and incide... |
01 |
WILL |
33 |
6
|
ASPHALT
|
$474,014 |
| 17 |
80B22 |
(3.71-Mile) SMART overlay, proposed pavement markings, ADA ramp details at the r... |
01 |
COOK |
129 |
6
|
ASPHALT
|
$7.9M |
| 18 |
80B23 |
(2.81-Mile) SMART Overlay and Shoulder Repair consist of pavement patching, mill... |
01 |
KANE |
69 |
7
|
ASPHALT
|
$4.0M |
| 19 |
80B28 |
(4,957.13-Ft) HMA overlay of existing concrete pavement and ADA improvements. Th... |
01 |
COOK |
125 |
7
|
ASPHALT
|
$4.5M |
| 20 |
80B33 |
(5,764-Ft) Design Overlay, ADA Improvements consists of (HMA) surface removal, p... |
01 |
COOK |
72 |
3
|
ASPHALT
|
$1.2M |
| 21 |
80B35 |
(1.53-Mile) SMART overlay and ADA Improvement project includes hot-mix asphalt r... |
01 |
COOK |
116 |
6
|
ASPHALT
|
$2.7M |
| 22 |
80B47 |
Bridge Painting project consists of reconstruction of the expansion joints with ... |
01 |
COOK |
23 |
5
|
MISC & PRO SERVICES
|
$608,906 |
| 23 |
80B51 |
(0.20-Mile) Bridge Painting project consists of cleaning and painting steel surf... |
01 |
COOK |
18 |
6
|
MISC & PRO SERVICES
|
$581,683 |
| 24 |
80B58 |
(3.20-Mile) Project consists of drainage structure cleaning, frame and grate rep... |
01 |
COOK |
13 |
2
|
MISC & PRO SERVICES
|
$221,971 |
| 25 |
80B66 |
This is a permanent protective shielding project and the work to be performed un... |
01 |
COOK |
7 |
6
|
STRUCTURAL
|
$495,900 (6/7) |
| 26 |
80B77 |
The project consists of the removal and replacement of a fixed platform scale th... |
01 |
WILL |
49 |
6
|
DEMOLITION
|
$983,751 (48/49) |
| 27 |
80B78 |
(1.90-Mile) Project consists of refinishing surface art medallions on existing r... |
01 |
COOK |
7 |
3
|
MISC & PRO SERVICES
|
$201,200 (5/7) |
| 28 |
80B87 |
(5.37-Mile) Project consists of a design overlay of the existing pavement with H... |
01 |
COOK |
73 |
6
|
ASPHALT
|
$3.9M |
| 29 |
80C45 |
(1.2-Mile) Standard Overlay for US 14 and SMART Overlay for South Frontage Road ... |
01 |
MCHENRY |
83 |
5
|
ASPHALT
|
$1.9M |
| 30 |
80C48 |
(3,760-Ft) Standard Overlay, HMA surface removal and overlay, pavement patching ... |
01 |
LAKE |
115 |
6
|
ASPHALT
|
$1.9M |
| 31 |
80C89 |
This work includes mast arm and pole replacement, installation of LED signal hea... |
01 |
COOK |
91 |
2
|
ELECTRICAL
|
$2.7M (89/91) |
| 32 |
80C90 |
(2,470-Ft) Bridge repair work consists of repairs and temporary shoring to the e... |
01 |
COOK |
38 |
5
|
STRUCTURAL
|
$2.3M (37/38) |
| 33 |
80C96 |
Forestry, weed control, and landscape work includes pruning, tree removal, and s... |
01 |
VARIOUS |
68 |
2
|
LANDSCAPE
|
$2.6M (67/68) |
| 34 |
80C97 |
(110-Ft) Project consists of advanced shoring at structures (SN 016-2047 and SN ... |
01 |
COOK |
8 |
4
|
STRUCTURAL
|
$588,796 |
| 35 |
80D00 |
(4,498-Ft) Smart Overlay, ADA Improvements include Hot-Mix Asphalt (HMA) removal... |
01 |
COOK |
126 |
8
|
ASPHALT
|
$2.6M |
| 36 |
80D36 |
This is an advanced procurement of selective mechanical and electrical component... |
01 |
WILL |
3 |
3
|
MISC & PRO SERVICES
|
$3.6M (1/3) |
| 37 |
80D46 |
The scope of work for this improvement includes a new 5x3 culvert under US 41 wi... |
01 |
LAKE |
86 |
11
|
MISC & PRO SERVICES
|
$777,520 (85/86) |
| 38 |
61L30 |
Full-depth reclamation and HMA surfacing of Brown Road, Campton Hills Road, Denk... |
01 |
KANE |
42 |
5
|
MISC & PRO SERVICES
|
$20.4M |
| 39 |
61M42 |
Resurfacing Wheeler Road from Esker Drive to IL 47 in the village of Sugar Grove... |
01 |
KANE |
49 |
5
|
ASPHALT
|
$1.1M |
| 40 |
61M43 |
Resurfacing Dugan Road from North Wheeler Road to south of Fays Lane in the vill... |
01 |
KANE |
32 |
5
|
ASPHALT
|
$1.2M |
| 41 |
61M44 |
Resurfacing 1st Street from IL 72 to Dunning Avenue in the village of West Dunde... |
01 |
KANE |
58 |
5
|
ASPHALT
|
$930,445 |
| 42 |
61M46 |
HMA resurfacing of Skokie Boulevard from the southern city limits to Lake-Cook R... |
01 |
COOK |
37 |
4
|
ASPHALT
|
$2.8M |
| 43 |
61M51 |
Reconstruction of HMA trail from 109th Street and Lavergne Avenue to Harold L. R... |
01 |
COOK |
93 |
4
|
ELECTRICAL
|
$2.9M (89/93) |
| 44 |
61M53 |
Resurfacing Lexington Drive from Lake Cook Road to McHenry Road in the village o... |
01 |
COOK |
46 |
5
|
ASPHALT
|
$666,357 |
| 45 |
64L94 |
0.91 miles of reconstruction on IL 81 from 0.2 miles west of Union St to 0.3 mil... |
02 |
HENRY |
186 |
5
|
STRUCTURAL
|
$11.7M (182/186) |
| 46 |
64T07 |
Bridge repairs and joint replacement on SN 071-0036, carrying IL 72 over drainag... |
02 |
OGLE |
42 |
5
|
MISC & PRO SERVICES
|
$898,171 |
| 47 |
64T46 |
Bridge repairs, deck overlay and joint replacement on SN 098-0103, carrying IL 7... |
02 |
WHITESIDE |
36 |
5
|
MISC & PRO SERVICES
|
$480,197 |
| 48 |
64T47 |
Bridge repairs, deck overlay and joint replacement on SN 071-0078, carrying IL 6... |
02 |
OGLE |
41 |
5
|
MISC & PRO SERVICES
|
$808,300 |
| 49 |
64T58 |
Bridge repairs and joint replacement on SN 089-0038, carrying IL 75 over Pecaton... |
02 |
STEPHENSON |
43 |
3
|
MISC & PRO SERVICES
|
$1.3M (41/43) |
| 50 |
64V31 |
Intersection safety improvements at US 52/IL 64 and IL 78 in Carroll County, US ... |
02 |
VARIOUS |
23 |
1
|
ELECTRICAL
|
$367,698 |
| 51 |
64V39 |
1.41 miles of patching and standard overlay on South St from Locust Ave to Galen... |
02 |
STEPHENSON |
51 |
1
|
ASPHALT
|
$2.3M |
| 52 |
64V40 |
Shoulder resurfacing and reconstruction, drainage, erosion control, ditch gradin... |
02 |
ROCK ISLAND |
131 |
4
|
ASPHALT
|
$5.6M (129/131) |
| 53 |
64V42 |
0.76 miles of patching, cold milling, and standard overlay on WB IL 2 East 4th S... |
02 |
WHITESIDE |
53 |
2
|
ASPHALT
|
$1.5M |
| 54 |
85791 |
Construction of a shared-use path along Rockton Road from 0.1 mile west of Aspla... |
02 |
WINNEBAGO |
72 |
3
|
UNDERGROUND
|
$611,619 (71/72) |
| 55 |
85794 |
Sidewalk replacement and construction of new sidewalks at various locations in t... |
02 |
ROCK ISLAND |
38 |
7
|
PCC FLATWORK
|
$675,029 |
| 56 |
66A91 |
Pavement resurfacing on the I-80 and I-39 interchange entrance/exit ramps with m... |
03 |
LASALLE |
165 |
1
|
ASPHALT
|
$16.7M (159/165) |
| 57 |
66C06 |
Milling and resurfacing 3 3/4 inches (designed overlay), class D patching, pipe ... |
03 |
GRUNDY |
78 |
3
|
ASPHALT
|
$5.9M (76/78) |
| 58 |
66K39 |
Improvements to a dual structure (SN 027-0052 and 027-0053) which carries Inters... |
03 |
FORD |
142 |
4
|
STRUCTURAL
|
$13.8M (141/142) |
| 59 |
66M80 |
Superstructure replacement of various structures on I-57 including SN 038-0003, ... |
03 |
IROQUOIS |
189 |
0
|
STRUCTURAL
|
$26.2M (186/189) |
| 60 |
66M84 |
Removal of the existing box culvert (SN 050-2546) and replacement with 2-42" EQR... |
03 |
LASALLE |
81 |
5
|
TRAFFIC CONTROL
|
$407,873 (80/81) |
| 61 |
66M85 |
Deck replacement (SN 053-0149) on IL 23 at the BNSF RR and Vermilion River, 0.8 ... |
03 |
LIVINGSTON |
92 |
0
|
STRUCTURAL
|
$5.8M |
| 62 |
66M92 |
Culvert replacements (SN 053-2588 and -2589) over an Indian Creek Tributary 1 mi... |
03 |
LIVINGSTON |
65 |
7
|
TRAFFIC CONTROL
|
$783,337 |
| 63 |
66N23 |
Removal and replacement of the existing culvert structure (SN 053-2548) carrying... |
03 |
LIVINGSTON |
79 |
0
|
TRAFFIC CONTROL
|
$527,690 (78/79) |
| 64 |
66N45 |
Superstructure replacement (SN 006-0112) at CH 8 (Overhead), 2 miles north of US... |
03 |
BUREAU |
83 |
3
|
STRUCTURAL
|
$2.7M (82/83) |
| 65 |
66T09 |
Various sizes of Class B pavement patching pavement striping and aggregate wedge... |
03 |
IROQUOIS |
22 |
9
|
PCC FLATWORK
|
$653,163 |
| 66 |
66T10 |
Removal and replacement of the fabric reinforced elastomeric troughs and associa... |
03 |
LASALLE |
5 |
3
|
TRAFFIC CONTROL
|
$200,838 |
| 67 |
66T11 |
Washing all components of Structure No. 050-0079 carrying F.A.P. Route 46 (IL 25... |
03 |
LASALLE |
6 |
2
|
MISC & PRO SERVICES
|
$123,641 |
| 68 |
66T12 |
Project is located at Structure No. 032-0099 carrying F.A.P. Route 326 (IL 47) o... |
03 |
GRUNDY |
5 |
3
|
MISC & PRO SERVICES
|
$119,948 |
| 69 |
66T14 |
Removing and installing new mast arms, foundations, and street signs in three in... |
03 |
BUREAU |
35 |
2
|
ELECTRICAL
|
$578,797 (34/35) |
| 70 |
66T15 |
Removing and installing new mast arms, foundations, and street signs in three in... |
03 |
LASALLE |
36 |
2
|
ELECTRICAL
|
$632,590 (35/36) |
| 72 |
66T29 |
This project is located on F.A.P. Route 681 (IL 116), Section (115, 116)PP, begi... |
03 |
FORD |
6 |
7
|
PCC FLATWORK
|
$465,084 |
| 73 |
66T36 |
One year contract to repair damaged High Tension Cable Median Barrier, Guardrail... |
03 |
VARIOUS |
50 |
3
|
FENCING & GUARDRAIL
|
$2.0M |
| 74 |
66T39 |
Pavement patching and joint repair along I-39 at the following interchanges in L... |
03 |
LASALLE |
37 |
4
|
PCC FLATWORK
|
$3.3M (36/37) |
| 75 |
66T40 |
Litter Picking shall consist of the pickup, removal and satisfactory disposal of... |
03 |
VARIOUS |
2 |
4
|
MISC & PRO SERVICES
|
$342,052 |
| 76 |
66T41 |
Litter picking on interstate I-55, throughout Livingston and Grundy Counties in ... |
03 |
GRUNDY |
2 |
5
|
MISC & PRO SERVICES
|
$129,560 |
| 77 |
66T42 |
Litter picking_on interstate I-57, throughout Ford, Iroquois, and Kankakee Count... |
03 |
FORD |
2 |
5
|
MISC & PRO SERVICES
|
$181,538 |
| 78 |
66T45 |
Class B patching at the concrete section of FAP 603 (US 52) over I-39, beginning... |
03 |
LASALLE |
17 |
9
|
PCC FLATWORK
|
$834,233 |
| 79 |
87859 |
Resurfacing of E 980N Road from IL 99 to the west corporate limits of Milford. |
03 |
IROQUOIS |
28 |
2
|
ASPHALT
|
$4.1M |
| 80 |
87895 |
Resurface 800 N Road from I-57 ramps to US 45. |
03 |
IROQUOIS |
33 |
2
|
ASPHALT
|
$878,685 |
| 81 |
46678 |
Installation of pavement marking on various routes in various counties throughou... |
04 |
VARIOUS |
14 |
2
|
PAVEMENT MARKINGS
|
$6.5M |
| 82 |
46679 |
Replaecment of raised reflective pavement markers on various routes in various c... |
04 |
VARIOUS |
2 |
3
|
PAVEMENT MARKINGS
|
$1.7M |
| 83 |
46918 |
Reconstruction of SFWA roads with a Bituminous Surface Treatment_with Fog Seal S... |
04 |
MARSHALL |
60 |
3
|
EARTHWORK
|
$1.2M (58/60) |
| 84 |
68C93 |
Resurfacing IL 6 from north of IL 29 to IL 40 (Knoxville Ave) in Peoria in Peori... |
04 |
PEORIA |
60 |
2
|
ASPHALT
|
$11.7M (59/60) |
| 85 |
68J15 |
Bridge deck overlay, joint replacement/repairs and bridge approach roadway impro... |
04 |
TAZEWELL |
121 |
2
|
ASPHALT
|
$3.5M |
| 86 |
68J31 |
Resurface IL 98 from IL 29 to 0.2 mile East of Parkway Drive in Tazewell County.... |
04 |
TAZEWELL |
59 |
1
|
ASPHALT
|
$2.4M |
| 87 |
68J50 |
Resurfacing 20th St from US 34 to North St in Kirkwood and on North St from 20th... |
04 |
WARREN |
32 |
2
|
ASPHALT
|
$1.7M |
| 88 |
68J56 |
Resurface IL 116 (W. Harmon Highway, W. Lincoln Ave.) from Kickapoo Creek to Gri... |
04 |
PEORIA |
61 |
1
|
ASPHALT
|
$2.2M (60/61) |
| 89 |
68J59 |
Resurfacing McMullen Rd and IL 122 from west of I-155 to 2.1 miles east of Hoped... |
04 |
TAZEWELL |
84 |
1
|
ASPHALT
|
$7.8M (81/84) |
| 90 |
68J61 |
6.17 miles patching and resurfacing of I-74 from 0.3 miles west of E Main Street... |
04 |
KNOX |
125 |
2
|
ASPHALT
|
$22.1M (121/125) |
| 91 |
68J70 |
9 miles of patching, CIR, resurfacing, guardrail replacedment, and ADA ramps on ... |
04 |
WOODFORD |
155 |
2
|
ASPHALT
|
$9.9M (154/155) |
| 92 |
68J72 |
Resurfacing IL 89 from the Putnam County line to IL 17, South of Varna in Marsha... |
04 |
MARSHALL |
66 |
1
|
ASPHALT
|
$5.5M |
| 93 |
68K14 |
Resurfacing IL 94 from IL 116 to 300N in Henderson County. 5.737 miles gross len... |
04 |
HENDERSON |
135 |
2
|
ASPHALT
|
$9.4M |
| 94 |
68K18 |
Resurfacing US 24/IL 29 (Main St) from north of Wesley Rd to south of Poplar St ... |
04 |
TAZEWELL |
85 |
1
|
ASPHALT
|
$2.0M (84/85) |
| 95 |
68K19 |
Resurfacing US 136 from 0.1 miles westof TR 226 to 0.1 miles west of CH 18, west... |
04 |
MCDONOUGH |
54 |
1
|
ASPHALT
|
$2.7M |
| 96 |
68K21 |
Resurfacing BUS 67 from 0.5 mi. S. of 90th Ave., N. of Roseville to 0.4 mi. S. o... |
04 |
WARREN |
51 |
2
|
ASPHALT
|
$1.6M |
| 97 |
68K85 |
Replacement of traffic signal heads and vehicle detection at various locations i... |
04 |
PEORIA |
12 |
3
|
ELECTRICAL
|
$664,387 |
| 98 |
68K90 |
Partial depth HMA patching on US 24 and resurfacing (1,000 ft) rest area roadway... |
04 |
FULTON |
31 |
1
|
ASPHALT
|
$524,959 (29/31) |
| 99 |
68K93 |
Relocation of high mast light towers to new foundations on I-74 in Peoria and Ta... |
04 |
PEORIA |
12 |
3
|
ELECTRICAL
|
$592,222 |
| 100 |
68K96 |
Partial and full depth HMA patching on Morton Ave from north of Clark St to Jack... |
04 |
TAZEWELL |
15 |
2
|
ASPHALT
|
$463,241 |
| 101 |
68K98 |
Partial and full depth patching on IL 93 from IL 91 (S) to IL 40 in Stark County... |
04 |
STARK |
7 |
2
|
ASPHALT
|
$737,817 |
| 102 |
89864 |
Removal and replacement of sidewalk along SW 6th St. from west of College Ave. (... |
04 |
MERCER |
12 |
7
|
PCC FLATWORK
|
$269,942 |
| 103 |
89892 |
Cape seal with pavement markings on CH 2 and bituminous surface treatment on CH ... |
04 |
MERCER |
9 |
3
|
ASPHALT
|
$1.4M |
| 104 |
70794 |
4.99 miles of pavement rehab Designed_Overlay Resurfacing (INT-4th), Pipe Underd... |
05 |
MCLEAN |
85 |
1
|
ASPHALT
|
$17.5M (81/85) |
| 107 |
70D62 |
Replacement of SN 023-0014 with SN 023-0036 over the DandEI Railroad 0.3 miles w... |
05 |
EDGAR |
119 |
2
|
STRUCTURAL
|
$6.2M (118/119) |
| 108 |
70F48 |
Paving and parking lot improvements at three (3) McLean County IDOT storage faci... |
05 |
MCLEAN |
18 |
2
|
ASPHALT
|
$1.2M |
| 110 |
70H86 |
1.18 miles of patching and chip seal A-1 (Fog Seal), Ford Harris Rd to Hensley R... |
05 |
CHAMPAIGN |
28 |
2
|
ASPHALT
|
$426,844 |
| 111 |
72459 |
6 miles of patching, HMA surface removal, HMA overlay, resurfacing HMA shoulders... |
06 |
PIKE |
30 |
2
|
ASPHALT
|
$2.5M |
| 112 |
72491 |
Patching, curb and gutter replacement, HMA removal and overlay, guardrail replac... |
06 |
SANGAMON |
191 |
2
|
ASPHALT
|
$11.4M (188/191) |
| 113 |
72509 |
Highway lighting upgrades on I-55 at the Broadwell interchange. |
06 |
LOGAN |
20 |
2
|
ELECTRICAL
|
$533,178 |
| 114 |
72512 |
Bridge deck patching on SN 069-0512 carrying US 67 southbound over Mauvaise Terr... |
06 |
MORGAN |
14 |
6
|
TRAFFIC CONTROL
|
$183,751 |
| 115 |
72547 |
5.9 miles of resurfacing on IL 29 / IL 123 from 0.1 miles west of the Menard / S... |
06 |
MENARD |
48 |
2
|
ASPHALT
|
$3.9M |
| 116 |
72552 |
Gutter removal and replacement on IL 78 from south of CH 7 (Chandlerville Road) ... |
06 |
CASS |
12 |
8
|
EARTHWORK
|
$246,591 |
| 117 |
72601 |
Bridge deck overlay and bridge painting on SN 075-0098 and 075-0099 carrying I-7... |
06 |
PIKE |
66 |
4
|
STRUCTURAL
|
$8.9M (63/66) |
| 118 |
72639 |
9.8 miles of shoulder repair on I-72 from I-172 to 0.9 miles east of IL 96 and o... |
06 |
ADAMS |
28 |
2
|
ASPHALT
|
$9.5M |
| 119 |
72E71 |
Bridge joint repairs at various locations on I-55 near Lincoln. |
06 |
LOGAN |
12 |
5
|
STRUCTURAL
|
$338,177 |
| 120 |
72E72 |
Shoulder repairs on IL 110, IL 336 from CH 10 to the Adams County line. |
06 |
HANCOCK |
8 |
1
|
ASPHALT
|
$408,274 |
| 121 |
72E73 |
Riprap installation and minor bridge repairs on SN 085-0039 carrying IL 100 over... |
06 |
SCHUYLER |
7 |
8
|
TRAFFIC CONTROL
|
$114,982 |
| 122 |
72E76 |
Structural steel repairs on SN 084-0106 and 084-0111 over I-55 at the Divernon a... |
06 |
SANGAMON |
7 |
3
|
STRUCTURAL
|
$276,050 |
| 124 |
72D29 |
HMA surface removal, HMA resurfacing, paved shoulders with rumble strips, concre... |
06 |
ADAMS |
80 |
1
|
ASPHALT
|
$6.0M |
| 125 |
72J41 |
4.6 miles of resurfacing, ADA improvements and bridge deck repairs on IL 96 from... |
06 |
ADAMS |
84 |
1
|
ASPHALT
|
$4.5M |
| 126 |
72J76 |
Microsilica concrete overlays on IL 99 at Cedar Creek 0.5 miles north of Camden ... |
06 |
SCHUYLER |
62 |
3
|
MISC & PRO SERVICES
|
$2.3M |
| 127 |
93848 |
HMA resurfacing of North 36th St. from Wavering Park Rd. to Wisman Ln. |
06 |
ADAMS |
26 |
1
|
ASPHALT
|
$851,469 |
| 128 |
93854 |
Construction of PCC sidewalk with ADA compliance from Pana Junior High School to... |
06 |
CHRISTIAN |
23 |
4
|
PCC FLATWORK
|
$430,034 |
| 129 |
93857 |
Full-depth reclamation with soil cement base, surface profiling and bituminous s... |
06 |
SCOTT |
13 |
1
|
ASPHALT
|
$975,862 |
| 130 |
93858 |
Microsurfacing on Ferris Road from 1000E Road to 1750 Road in Hancock County. |
06 |
HANCOCK |
4 |
3
|
ASPHALT
|
$619,478 |
| 131 |
74435 |
Reconstructing the I-57 and IL 16 interchange located east of Mattoon from a clo... |
07 |
COLES |
358 |
0
|
EARTHWORK
|
$56.6M (353/358) |
| 132 |
74650 |
Superstructure replacement and bridge widening of 2 structures on I-57 over IC R... |
07 |
COLES |
128 |
0
|
STRUCTURAL
|
$12.5M (127/128) |
| 133 |
74705 |
Replacement of 2 structures carrying I-72 over IL 121 and the IC Railroad, north... |
07 |
MACON |
115 |
3
|
STRUCTURAL
|
$12.9M |
| 134 |
74829 |
1.5 miles of resurfacing with curb and gutter upgrades on IL 32 in Sullivan. |
07 |
MOULTRIE |
141 |
2
|
ASPHALT
|
$3.2M |
| 135 |
74856 |
Bridge replacement on US 36/IL 121 over Lake Shore Drive in Decatur. (SN 058-001... |
07 |
MACON |
103 |
0
|
STRUCTURAL
|
$4.7M (102/103) |
| 136 |
74E26 |
7.7 miles of shoulder reconstruction on IL 1 from E. 1200 Road (Bridgeport Road)... |
07 |
WABASH |
5 |
3
|
EARTHWORK
|
$301,586 |
| 137 |
74A10 |
Replacement of SN 058-0021 carrying US 36 over Long Creek tributary approximatel... |
07 |
MACON |
95 |
0
|
STRUCTURAL
|
$3.8M |
| 138 |
74B79 |
Bridge joint replacement, bridge deck patching, bridge deck scarification and ov... |
07 |
RICHLAND |
54 |
2
|
STRUCTURAL
|
$1.0M |
| 139 |
74D08 |
Bridge joint replacement, bridge deck patching, bridge deck scarification, bridg... |
07 |
MACON |
69 |
0
|
MISC & PRO SERVICES
|
$6.6M |
| 140 |
74D42 |
Demolition of buildings, tree removal, sign removal, and seeding on US 40 / IL 3... |
07 |
EFFINGHAM |
42 |
5
|
DEMOLITION
|
$777,840 (40/42) |
| 141 |
74D51 |
Fencing removing and replacement at the Effingham Maintenance Yard. |
07 |
EFFINGHAM |
9 |
2
|
FENCING & GUARDRAIL
|
$298,706 |
| 142 |
74D52 |
17.5 miles of resurfacing on US 40 from IL 49 to IL 1 in Marshall. |
07 |
CLARK |
63 |
3
|
ASPHALT
|
$14.0M |
| 143 |
74D54 |
8 miles of resurfacing, aggregate wedge shoulder, HMA shoulders and patching on ... |
07 |
COLES |
39 |
2
|
ASPHALT
|
$2.9M |
| 144 |
74D55 |
4.3 miles of patching, milling and resurfacing on US 51 from 0.8 miles south of ... |
07 |
MACON |
41 |
1
|
ASPHALT
|
$9.0M |
| 145 |
74D58 |
Applying chip seal at the Fairfield Maintenance Yard. |
07 |
WAYNE |
3 |
1
|
ASPHALT
|
$86,837 |
| 146 |
95996 |
Reconstruction of intersections along US 40 from Race Street to Wall Street in t... |
07 |
EFFINGHAM |
18 |
8
|
PCC FLATWORK
|
$285,542 |
| 147 |
95997 |
Construction of sidewalks from Kaskakia College to various locations in the city... |
07 |
FAYETTE |
45 |
6
|
PCC FLATWORK
|
$1.7M |
| 148 |
95A06 |
Full-depth pavement reclamation with an A-2 bituminous surface treatment on 1200... |
07 |
CUMBERLAND |
12 |
2
|
MISC & PRO SERVICES
|
$35.2M |
| 149 |
95A12 |
A-2 bituminous surface treatment on CH 15 from the southern city limit of Tower ... |
07 |
SHELBY |
4 |
1
|
ASPHALT
|
$1.4M |
| 150 |
76M95 |
Resurfacing on I-64 from 0.5 miles west of Beaver Pond Creek to 0.9 miles west o... |
08 |
WASHINGTON |
144 |
5
|
ASPHALT
|
$125.9M (140/144) |
| 151 |
76R32 |
New bridge deck on SN 060-0120 carrying IL 111 / IL 3 over Rodgers Avenue and Bl... |
08 |
MADISON |
120 |
3
|
STRUCTURAL
|
$6.7M (119/120) |
| 152 |
76R36 |
Bridge deck patching, microsilica concrete overlay, joint replacement, end diaph... |
08 |
ST CLAIR |
45 |
2
|
MISC & PRO SERVICES
|
$2.4M (43/45) |
| 153 |
76U38 |
Traffic signal replacement at various locations in Madison and St. Clair Countie... |
08 |
MADISON |
73 |
2
|
ELECTRICAL
|
$2.8M |
| 154 |
76U54 |
9.6 miles of micro-surfacing on IL 127 from the Montgomery County line to 0.1 mi... |
08 |
BOND |
24 |
3
|
ASPHALT
|
$1.1M |
| 155 |
76U76 |
Bridge deck repairs and deck overlay on SN 082-0007 carrying I-55 / I-64 over Tr... |
08 |
ST CLAIR |
26 |
3
|
MISC & PRO SERVICES
|
$587,117 (25/26) |
| 156 |
76U77 |
Bridge repairs, deck repairs and joint replacement/repairs on SN 061-0077 carryi... |
08 |
MARION |
42 |
2
|
MISC & PRO SERVICES
|
$1.2M |
| 157 |
76U81 |
Bridge cleaning at various locations in Madison and St. Clair counties. |
08 |
MADISON |
18 |
3
|
TRAFFIC CONTROL
|
$466,235 |
| 158 |
76U82 |
Bridge deck repairs on SN 082-0251 and 082-0252 carrying I-55 / I-64 over IL 3 r... |
08 |
ST CLAIR |
17 |
3
|
MISC & PRO SERVICES
|
$1.5M |
| 159 |
76U86 |
Bridge painting on IL 3 over NS Railroad in Granite City. (SN 060-0193 and 060-0... |
08 |
MADISON |
12 |
7
|
MISC & PRO SERVICES
|
$513,289 |
| 160 |
76U96 |
Highway lighting and traffic signal maintenance at various locations throughout ... |
08 |
VARIOUS |
107 |
2
|
ELECTRICAL
|
$2.1M (89/107) |
| 161 |
76U97 |
Guardrail and cable median repairs at various locations in District 8. |
08 |
VARIOUS |
38 |
2
|
FENCING & GUARDRAIL
|
$5.6M (36/38) |
| 162 |
76U98 |
Maintenance and service of all ITS equipment at various locations throughout Dis... |
08 |
VARIOUS |
7 |
2
|
ELECTRICAL
|
$508,298 |
| 163 |
76V03 |
Bridge painting on SN 060-0350 and 060-0351 carrying I-270 over the Mississippi ... |
08 |
MADISON |
7 |
7
|
TRAFFIC CONTROL
|
$562,178 |
| 164 |
76V06 |
40.25 miles of tree removal at various locations in Madison and Jersey Counties. |
08 |
JERSEY |
3 |
3
|
TREE REMOVAL
|
$598,343 |
| 165 |
76V08 |
Various interstate bridge deck patching on a callout basis throughout District 8... |
08 |
VARIOUS |
9 |
3
|
MISC & PRO SERVICES
|
$1.6M |
| 166 |
76V09 |
Structural repairs to various bridges at various locations throughout District 8... |
08 |
VARIOUS |
14 |
3
|
STRUCTURAL
|
$4.7M |
| 167 |
76V11 |
13 miles of pavement patching on IL 140 from Hamel to Alhambra and on IL 4 from ... |
08 |
MADISON |
25 |
4
|
ASPHALT
|
$1.8M (24/25) |
| 168 |
76V12 |
0.4 miles of patching and slurry seal on South 26th Street from Bond Avenue to I... |
08 |
ST CLAIR |
19 |
5
|
PCC FLATWORK
|
$207,693 (18/19) |
| 169 |
76V13 |
Traffic signal modernization at various locations throughout District 8. |
08 |
VARIOUS |
10 |
3
|
ELECTRICAL
|
$541,999 |
| 170 |
76V17 |
10.4 miles of bridge repairs and resurfacing on I-55/I-70/US 40 from 0.5 miles w... |
08 |
MADISON |
96 |
1
|
ASPHALT
|
$16.4M (92/96) |
| 171 |
76V18 |
6.5 miles of longitudinal joint repair on I-64 from 0.5 miles west of IL 4 in Ma... |
08 |
CLINTON |
14 |
4
|
ASPHALT
|
$3.2M |
| 172 |
97884 |
Resurfacing North Alby Street from Humbert Road to Wesley Way in the village of ... |
08 |
MADISON |
52 |
3
|
ASPHALT
|
$961,593 (46/52) |
| 173 |
97896 |
Sidewalk construction along various streets in the village of Worden. |
08 |
MADISON |
19 |
8
|
PCC FLATWORK
|
$368,494 |
| 174 |
97897 |
Cold-in-place pavement recycling on Bluff Road from DD Road to Hanover Road in M... |
08 |
MONROE |
25 |
2
|
ASPHALT
|
$2.9M |
| 175 |
97899 |
Resurfacing Martin Luther King Jr. Drive from State Street to Columbia Place in ... |
08 |
ST CLAIR |
60 |
3
|
PCC FLATWORK
|
$1.6M |
| 176 |
97903 |
Traffic signal installation at the intersection of Horseshoe Lake Road and McDon... |
08 |
MADISON |
42 |
3
|
ELECTRICAL
|
$545,270 |
| 177 |
78791 |
Removal and replacement of SN 002-0012 carrying IL 3 over a drainage ditch 0.5 m... |
09 |
ALEXANDER |
93 |
3
|
STRUCTURAL
|
$3.4M |
| 178 |
78977 |
Reconstruction of Benton Square (IL 14 / IL 37) with improved turning movements ... |
09 |
FRANKLIN |
54 |
3
|
PCC FLATWORK
|
$1.1M |
| 179 |
78A13 |
Box culvert replacements at 4 locations: 1) SN 091-2005 carrying IL 127 over a s... |
09 |
UNION |
83 |
3
|
UNDERGROUND
|
$2.6M |
| 180 |
78A85 |
Pavement patching, HMA removal, HMA resurfacing, shoulder work and ADA upgrades ... |
09 |
ALEXANDER |
72 |
3
|
ASPHALT
|
$5.0M (71/72) |
| 181 |
78B49 |
0.4 miles of pavement removal with PCC replacement, aggregate subgrade improveme... |
09 |
JEFFERSON |
56 |
4
|
PCC FLATWORK
|
$5.0M |
| 182 |
78B59 |
1.8 miles of resurfacing on IL 148 from IL 14 to Yellow Bank Road. |
09 |
FRANKLIN |
44 |
3
|
ASPHALT
|
$1.4M |
| 183 |
78B80 |
10.5 miles of tree trimming on IL 34 from Akin Blacktop to the Saline County lin... |
09 |
FRANKLIN |
3 |
2
|
TREE REMOVAL
|
$344,708 |
| 184 |
78B94 |
Mast arm upgrades at the intersection of US 45 and IL 13. |
09 |
SALINE |
57 |
2
|
ELECTRICAL
|
$549,341 |
| 185 |
78C10 |
Repairs to SN 097-0062 carrying US 45 over Skillet Fork Creek, 0.8 miles south o... |
09 |
WHITE |
29 |
3
|
MISC & PRO SERVICES
|
$545,280 |
| 186 |
78C13 |
Slope repairs on IL 148 over Crab Orchard Lake, 1.5 miles south of Old IL 13. |
09 |
WILLIAMSON |
7 |
3
|
EARTHWORK
|
$220,014 |
| 187 |
78C15 |
Painting two bridges over I-64 in White County. (SN 097-0045 and 097-0050) |
09 |
WHITE |
13 |
7
|
MISC & PRO SERVICES
|
$608,603 |
| 188 |
78C18 |
9.1 miles of tree planting along the Crab Orchard Greenway multi-use path and th... |
09 |
JACKSON |
7 |
0
|
LANDSCAPE
|
$200,054 (5/7) |
| 189 |
78C20 |
Various electrical repairs and/or replacements at various locations throughout D... |
09 |
VARIOUS |
52 |
1
|
ELECTRICAL
|
$364,950 |
| 190 |
78C24 |
5.8 miles of resurfacing on IL 127 from 0.3 miles north of Deer Run Road to the ... |
09 |
PERRY |
25 |
3
|
ASPHALT
|
$2.3M (24/25) |
| 191 |
78C25 |
2.8 miles of resurfacing on IL 150 from 0.2 miles north of Cutler (Reeses Hill R... |
09 |
PERRY |
30 |
3
|
ASPHALT
|
$2.1M |
| 192 |
99748 |
Construction of new sidewalks along Fair St. and Morning Side Dr. in the city of... |
09 |
WILLIAMSON |
16 |
4
|
PCC FLATWORK
|
$308,219 |
| 193 |
99769 |
Resurfacing Grand Chain Road from Pulaski County Line to Boaz Road. |
09 |
MASSAC |
19 |
1
|
ASPHALT
|
$857,511 (18/19) |
| 194 |
99770 |
Resurfacing Bay City Road from 0.4 mile south of Azotus Road to 1.1 miles north ... |
09 |
POPE |
11 |
1
|
ASPHALT
|
$988,018 |
| 195 |
99771 |
HMA resurfacing of Tolle Rd. from E. Breezeway Rd. to N. Miller Lake Ln. in Jeff... |
09 |
JEFFERSON |
13 |
2
|
ASPHALT
|
$1.4M |
| 196 |
99772 |
HMA resurfacing with aggregate shoulders and pavement marking on Blairsville Rd.... |
09 |
HAMILTON |
13 |
2
|
ASPHALT
|
$2.9M |
| 198 |
61M10 |
Traffic signal modernization along Indian Trail Road between Ohio Street and Pen... |
01 |
KANE |
168 |
4
|
ELECTRICAL
|
$4.4M (167/168) |
| 199 |
61M49 |
Installation of pedestrian lighting along the illinois Prairie Path in the villa... |
01 |
COOK |
66 |
5
|
ELECTRICAL
|
$2.1M (65/66) |
| 200 |
64N73 |
1.33 miles of pavement patching, cold milling, and HMA resurfacing along with AD... |
02 |
STEPHENSON |
145 |
1
|
PCC FLATWORK
|
$5.9M |
| 201 |
64S70 |
5.0 miles of pavement patching, cold milling, and HMA resurfacing on IL 26 from ... |
02 |
STEPHENSON |
64 |
2
|
ASPHALT
|
$5.0M |
| 202 |
85792 |
Cold-in-place recycling on Orangeville Road from McConnell Road to IL 26. |
02 |
STEPHENSON |
7 |
2
|
ASPHALT
|
$936,091 |
| 203 |
87851 |
Replace the bridge carrying CH 14 over Trim Creek located 3.3 miles south of IL ... |
03 |
KANKAKEE |
46 |
4
|
STRUCTURAL
|
$1.0M |
| 204 |
97827 |
Construction of a southbound right-turn lane at the intersection of Old Collinsv... |
08 |
ST CLAIR |
92 |
6
|
PCC FLATWORK
|
$441,220 (90/92) |
| 205 |
64U86 |
1.5 miles of pavement patching along Alpine Rd. between Riverside Blvd and Sprin... |
02 |
WINNEBAGO |
19 |
3
|
PCC FLATWORK
|
$801,796 |
| 206 |
64V25 |
Resurfacing US 20 ramp intersection returns at Montague Rd. and Meridian Rd. |
02 |
WINNEBAGO |
13 |
2
|
ASPHALT
|
$200,717 |
| 207 |
66R94 |
Cleaning and painting all structural steel and non-structure steel components at... |
03 |
GRUNDY |
17 |
4
|
MISC & PRO SERVICES
|
$313,003 |
| 208 |
66T32 |
Herbicide, seeding, landscaping, and maintenance for this pollinator project loc... |
03 |
LIVINGSTON |
7 |
1
|
LANDSCAPE
|
$826,350 (6/7) |
| 209 |
66T60 |
Removal and proper disposal of medium (6-15 inch diameter) and large (greater th... |
03 |
VARIOUS |
5 |
2
|
TREE REMOVAL
|
$1.1M |
| 210 |
70H72 |
Wing wall repair at Kickapoo Pond 0.2 mi west of Skykine Dr. west of Tilton. |
05 |
VERMILION |
8 |
2
|
MISC & PRO SERVICES
|
$410,506 |
| 211 |
70J03 |
Bridge painting of two structures on I-55 and I-72 in McLean and Piatt Counties.... |
05 |
MCLEAN |
12 |
6
|
MISC & PRO SERVICES
|
$434,852 |
| 212 |
62L30 |
(2.95-Mile) Roadway Reconstruction and widening with hot-mix asphalt pavement, r... |
01 |
COOK |
205 |
12
|
ASPHALT
|
$15.0M (200/205) |
| 213 |
62V08 |
The work on this project consists of ditch regrading, culvert replacement, and v... |
01 |
COOK |
113 |
10
|
EARTHWORK
|
$2.1M (112/113) |
| 001A |
LO034 |
|
06 |
LOGAN |
18 |
1
|
DEMOLITION
|
$2.8M (7/18) |
| 003A |
DU097 |
|
01 |
DUPAGE |
16 |
4
|
ASPHALT
|
$300,785 (14/16) |
| 004A |
LA046 |
|
01 |
COOK |
19 |
2
|
ASPHALT
|
$542,684 (15/19) |
| 005A |
KA056 |
|
03 |
KANKAKEE |
39 |
4
|
ASPHALT
|
$2.1M (22/39) |
| 006A |
BL074 |
|
05 |
MCLEAN |
51 |
1
|
UNDERGROUND
|
$0.00 (0/51) |
| 007A |
BU001 |
|
01 |
WILL |
14 |
2
|
LANDSCAPE
|
$511,401 (6/14) |
| 008A |
DE089 |
|
07 |
MACON |
25 |
4
|
TRAFFIC CONTROL
|
$0.00 (0/25) |
| 009A |
LE058 |
|
01 |
WILL |
27 |
3
|
PAVEMENT MARKINGS
|
$399,008 (8/27) |
| 010A |
RB024 |
|
07 |
CRAWFORD |
15 |
1
|
MISC & PRO SERVICES
|
$425,561 (7/15) |