| 1 |
60N10 withdrawn |
(3.27-Mile) Roadway Reconstruction, Widening and Realigned project consists of r... |
01 |
LAKE |
534 |
0
|
EARTHWORK
|
$131.9M (491/534) |
| 2 |
62J16 |
This is a channelization and culvert replacement project consists of HMA binder ... |
01 |
KANE |
146 |
6
|
ASPHALT
|
$5.1M (145/146) |
| 3 |
62V13 |
(2.3-Mile) pavement patching, resurfacing with polymerized hot-mix asphalt surfa... |
01 |
COOK |
97 |
4
|
ASPHALT
|
$2.7M |
| 4 |
62V31 |
(8.2-Mile) Cracks and joints routing and filling, pavement marking and collatera... |
01 |
KANE |
17 |
0
|
PAVEMENT MARKINGS
|
$338,231 |
| 5 |
62V42 |
(1.41-Mile) This project consists of resurfacing the existing HMA pavement with ... |
01 |
COOK |
89 |
2
|
ASPHALT
|
$941,827 |
| 6 |
62V47 |
(4.43-Mile) Cleaning and sealing of longitudinal joints between traffic lanes an... |
01 |
COOK |
18 |
0
|
PAVEMENT MARKINGS
|
$407,149 |
| 7 |
62V65 |
(1.65-Mile) Crack and Joint sealing project consists of crack routing and fillin... |
01 |
DUPAGE |
17 |
0
|
PAVEMENT MARKINGS
|
$194,667 |
| 8 |
62W72 |
(4,251.83-Ft) The Work consists of culvert replacement, HMA pavement and shoulde... |
01 |
COOK |
124 |
2
|
UNDERGROUND
|
$2.5M (123/124) |
| 9 |
80C12 |
(386-Ft) Bridge Repair project and the work includes bridge deck patching, steel... |
01 |
COOK |
54 |
5
|
STRUCTURAL
|
$1.6M |
| 10 |
80C58 |
This project includes HMA surface removal and replacement on the bridge approach... |
01 |
WILL |
23 |
3
|
MISC & PRO SERVICES
|
$71,841 |
| 11 |
80C62 |
(2.75-Mile) Smart Overlay Improvements consists of pavement patching) hot-mix as... |
01 |
LAKE |
113 |
4
|
ASPHALT
|
$3.2M |
| 12 |
80C66 |
Bridge Deck overlay, bridge joint replacement and /repair include deck and appro... |
01 |
COOK |
81 |
4
|
MISC & PRO SERVICES
|
$1.3M |
| 13 |
80C67 |
(357-Ft) Bridge Deck Overlay (SN 016-0398) and CTA will undergo routine maintena... |
01 |
COOK |
59 |
2
|
MISC & PRO SERVICES
|
$2.0M |
| 14 |
80C69 |
(250-Ft) Bridge Repairs include hydro scarification, deck slab repair, polymer c... |
01 |
COOK |
46 |
3
|
MISC & PRO SERVICES
|
$982,221 (43/46) |
| 15 |
80C73 |
Bridge Deck Overlay and Bridge Deck repairs and replacement (SN 099-4622 and SN ... |
01 |
WILL |
73 |
5
|
MISC & PRO SERVICES
|
$1.5M (72/73) |
| 16 |
80C75 |
(124-Ft) Project consists of a staged construction to complete deck overlay and ... |
01 |
COOK |
68 |
4
|
MISC & PRO SERVICES
|
$455,152 |
| 17 |
80C93 |
(1.630-Mile) Standard Overlay and Curb Ramps Improvements (ADA Improvements) con... |
01 |
LAKE |
92 |
2
|
ASPHALT
|
$4.1M (91/92) |
| 18 |
80D34 |
(1.46-Mile) SMART overlay project in which the work to be performed under this c... |
01 |
COOK |
63 |
3
|
ASPHALT
|
$894,169 |
| 19 |
80D75 |
(3.32-Mile) Standard overlay and ADA curb ramp improvement project consists of h... |
01 |
COOK |
117 |
4
|
ASPHALT
|
$5.1M |
| 20 |
80F19 |
The work to be done under GRAFFITI REMOVAL shall consist of removing graffiti fr... |
01 |
VARIOUS |
2 |
1
|
MISC & PRO SERVICES
|
$1.7M |
| 21 |
80F48 |
This Project consists of Removing trees, as well as all incidental and collatera... |
01 |
VARIOUS |
15 |
0
|
TREE REMOVAL
|
$121,729 |
| 22 |
80F50 |
This is a pavement patching improvement consists of Class B Patching, Crack and ... |
01 |
LAKE |
58 |
2
|
PCC FLATWORK
|
$3.1M |
| 23 |
61F87 |
Sidewalk replacement along various routes in the city of Oak Forest. Additional ... |
01 |
COOK |
62 |
3
|
PCC FLATWORK
|
$2.4M |
| 24 |
61K73 |
HMA resurfacing, patching, pavement markings, sidewalks and ADA improvements at ... |
01 |
KANE |
55 |
2
|
ASPHALT
|
$1.3M |
| 25 |
61M06 |
Construction of a single span PPC deck beam bridge carrying Farrell Rd. over Spr... |
01 |
WILL |
70 |
4
|
STRUCTURAL
|
$1.1M |
| 26 |
61M33 |
Construction of a single-lane roundabout intersection at the intersection of Hig... |
01 |
KANE |
100 |
4
|
EARTHWORK
|
$1.5M (99/100) |
| 27 |
61M54 |
Construction of a pedestrian bridge over IL 19/Irving Park Rd., retaining walls ... |
01 |
DUPAGE |
114 |
4
|
STRUCTURAL
|
$5.1M |
| 28 |
61M55 |
Construction of a bridge to carry Randall Rd. over the CN Railway, reconstructio... |
01 |
KANE |
368 |
7
|
STRUCTURAL
|
$64.5M (360/368) |
| 29 |
61M65 |
Resurface Glenview Rd. from Washington St. to Metra Railroad and resurfacing Leh... |
01 |
COOK |
254 |
5
|
ELECTRICAL
|
$6.6M (231/254) |
| 30 |
61M69 |
HMA resurfacing and traffic signal improvement of 103rd St. from Southwest Highw... |
01 |
COOK |
94 |
4
|
ASPHALT
|
$1.1M |
| 31 |
61M70 |
Reconstruction of bridge superstructure carrying Theodore St. over Rock Run Cree... |
01 |
WILL |
152 |
4
|
STRUCTURAL
|
$7.8M |
| 32 |
61M72 |
Construction of a three-span PPC IL Beam bridge carrying Harmony Road over Coon ... |
01 |
MCHENRY |
114 |
3
|
STRUCTURAL
|
$4.3M (113/114) |
| 33 |
61M74 |
HMA resurfacing of Brainard Ave. from Harding Ave. to 31st St. in the village of... |
01 |
COOK |
50 |
3
|
PCC FLATWORK
|
$770,384 |
| 34 |
61M77 |
Construction of a single span PPC IL beam bridge carrying Paulsen Rd. over the N... |
01 |
MCHENRY |
96 |
3
|
STRUCTURAL
|
$2.0M |
| 35 |
61M81 |
HMA resurfacing of 5th Ave. from Roosevelt Rd. to Bataan Dr. in the village of M... |
01 |
COOK |
68 |
5
|
PCC FLATWORK
|
$1.4M |
| 36 |
61M82 |
Resurface Prairie Ave. from Brookfield Ave. to 31st St. in the village of Brookf... |
01 |
COOK |
146 |
4
|
UNDERGROUND
|
$4.4M (140/146) |
| 37 |
61M86 |
Sidewalk construction, curb and gutter replacement, street lighting improvements... |
01 |
COOK |
106 |
0
|
ELECTRICAL
|
$1.5M (103/106) |
| 38 |
61M88 |
HMA resurfacing of Crystal Lake Rd. from Algonquin Rd. to Miller Rd. in the vill... |
01 |
MCHENRY |
73 |
3
|
ASPHALT
|
$972,861 (72/73) |
| 39 |
61M89 |
Furnishing, storing and delivering the precast concrete beams and bearings for t... |
01 |
LAKE |
6 |
2
|
STRUCTURAL
|
$36,523 (3/6) |
| 40 |
64E09 |
Removal and replacement of the structure (SN 101-0109) carrying IL 75 over the R... |
02 |
WINNEBAGO |
141 |
2
|
STRUCTURAL
|
$8.6M (134/141) |
| 41 |
64F26 |
Culvert replacement 0.4 miles west of 780E and 0.4 miles east of Woodhull Rd in ... |
02 |
HENRY |
88 |
2
|
EARTHWORK
|
$2.2M |
| 42 |
64H87 |
2.7 miles of reconstruction, bridge replacement, interchange reconstruction, lig... |
02 |
ROCK ISLAND |
464 |
3
|
PCC FLATWORK
|
$98.4M (451/464) |
| 43 |
64L41 |
5.79 miles of designed overlay on US 6 from 0.1 miles west of Dilenbeck Dr to US... |
02 |
HENRY |
135 |
2
|
ASPHALT
|
$5.9M (132/135) |
| 44 |
64M06 |
Culvert replacement and intersection reconstruction on US 6 0.1 miles west of 10... |
02 |
HENRY |
64 |
2
|
UNDERGROUND
|
$881,398 |
| 45 |
64P60 |
Bridge and roadway reconstruction on US 20 over I-90 from 0.4 miles west of Whee... |
02 |
BOONE |
337 |
4
|
EARTHWORK
|
$35.1M (289/337) |
| 46 |
64S80 |
11.97 miles of Cold in Place Recycling, Cold Milling, and HMA resurfacing on IL ... |
02 |
LEE |
57 |
2
|
ASPHALT
|
$9.2M |
| 47 |
64U60 |
2.89 miles of pavement patching, cold milling, and HMA resurfacing on Springfiel... |
02 |
WINNEBAGO |
67 |
2
|
ASPHALT
|
$3.8M |
| 48 |
64V27 |
6 miles of of intermittent resurfacing on IL 84 from City of Hampton's Southern ... |
02 |
ROCK ISLAND |
9 |
1
|
ASPHALT
|
$524,798 |
| 50 |
64V82 |
Cleaning and painting of structural steel on SN 071-0055 carrying IL 64 over I-3... |
02 |
OGLE |
10 |
0
|
MISC & PRO SERVICES
|
$206,291 |
| 51 |
64V94 |
Bridge washing of SN 081-0011 carrying I-80 over the Mississippi River in Rock I... |
02 |
ROCK ISLAND |
6 |
1
|
MISC & PRO SERVICES
|
$34,609 |
| 52 |
64V95 |
Bridge washing of SN 081-0106 carrying I-280 over the Mississippi River in Rock ... |
02 |
ROCK ISLAND |
4 |
1
|
MISC & PRO SERVICES
|
$22,598 |
| 53 |
64V96 |
Bridge washing of 3 structures over the Mississippi River in various counties. |
02 |
CARROLL |
9 |
1
|
MISC & PRO SERVICES
|
$51,269 |
| 54 |
64W01 |
Full cleaning and painting of structural steel of SN 043-0045 carrying IL 78 ove... |
02 |
JODAVIESS |
16 |
0
|
MISC & PRO SERVICES
|
$452,501 |
| 55 |
85784 |
Construction of a PCC shared-use path along 25th Avenue in the city of Moline. W... |
02 |
ROCK ISLAND |
56 |
2
|
STRUCTURAL
|
$3.0M |
| 56 |
85799 |
Reconstruction of the eastbound lanes and shoulders of the Rock Island-Milan Par... |
02 |
ROCK ISLAND |
92 |
2
|
PCC FLATWORK
|
$6.1M (88/92) |
| 57 |
85800 |
HMA resurfacing along Old River Rd. from Roscoe Rd. to IL 75. Additional work in... |
02 |
WINNEBAGO |
60 |
1
|
ASPHALT
|
$3.8M |
| 58 |
85802 |
Replacement of the bridge carrying 15th Ave. over the Rock River in the city of ... |
02 |
WINNEBAGO |
198 |
2
|
STRUCTURAL
|
$14.7M (193/198) |
| 59 |
46936 |
Improvements at Matthiessen State Park Annex consist of resurfacing E. 494th Rd ... |
03 |
LASALLE |
58 |
1
|
PCC FLATWORK
|
$1.4M (56/58) |
| 60 |
66K64 |
Removal and replacement of bridge structure (SN 050-0254) which carries Water St... |
03 |
LASALLE |
55 |
1
|
STRUCTURAL
|
$1.4M |
| 61 |
66M30 |
Superstructure replacement (SN 032-0087 / 0086) on IL 47 Over Buchanan St and Ar... |
03 |
GRUNDY |
149 |
5
|
STRUCTURAL
|
$9.6M |
| 62 |
66M78 |
Removal of a bridge and replacement with double 9'X9' culverts, SN 053-0103, whi... |
03 |
LIVINGSTON |
77 |
1
|
UNDERGROUND
|
$909,272 |
| 63 |
66M80 |
Superstructure replacement of various structures on I-57 including SN 038-0003, ... |
03 |
IROQUOIS |
191 |
1
|
STRUCTURAL
|
$29.5M (189/191) |
| 64 |
66N24 |
Removal and replacement of SN 050-0059 carrying US 52 over Mission Creek located... |
03 |
LASALLE |
149 |
1
|
ASPHALT
|
$10.8M (147/149) |
| 65 |
66P69 |
This project is located on FAP 68 (IL-23) and FAS 370 (Long Point Rd). IL 23 beg... |
03 |
LIVINGSTON |
103 |
1
|
ASPHALT
|
$6.4M |
| 66 |
66R49 |
Removal and replacement of the existing culvert structure (SN 019-2519) with an ... |
03 |
DEKALB |
85 |
1
|
UNDERGROUND
|
$1.8M (82/85) |
| 67 |
66T44 |
36.2 miles, on-call pavement patching and pavement marking at Type IV patches. B... |
03 |
LASALLE |
21 |
0
|
PCC FLATWORK
|
$4.2M |
| 68 |
66T48 |
11.5 miles of resurfacing from LaSalle 0.3 miles west of IL 178 to west of Fox R... |
03 |
LASALLE |
75 |
1
|
ASPHALT
|
$20.0M |
| 69 |
66T76 |
Bridge Deck Concrete Sealing with the parapets/curbs on various routes at variou... |
03 |
LASALLE |
9 |
1
|
STRUCTURAL
|
$183,610 |
| 70 |
66T80 |
This project is located on FAP 326 (IL-47) in the Morris Wetland bank east of IL... |
03 |
GRUNDY |
2 |
1
|
MISC & PRO SERVICES
|
$1,684 (1/2) |
| 71 |
68K99 |
PCC Pavement Patching and curb at the EB and WB I-74 Spoon River Rest Areas. |
04 |
KNOX |
24 |
2
|
PCC FLATWORK
|
$957,434 |
| 72 |
89870 |
Construction of a single-span plate girder bridge carrying Furrow Road over Lost... |
04 |
TAZEWELL |
56 |
3
|
STRUCTURAL
|
$1.9M |
| 73 |
89886 |
Construction of a single-span steel plate girder bridge carrying CH 38 over Shaw... |
04 |
FULTON |
58 |
3
|
STRUCTURAL
|
$2.2M |
| 74 |
70E42 |
8.425 miles of 3P policy - standard overlay from ILL 1 at Hoopeston to the India... |
05 |
VERMILION |
129 |
1
|
ASPHALT
|
$10.2M |
| 75 |
70F18 |
Mill, patch and resurface FAP 693 (ILL 9, US150) Locust Street from east of Main... |
05 |
MCLEAN |
179 |
2
|
PCC FLATWORK
|
$10.6M |
| 77 |
70H78 |
Bridge painting at various structures in Vermilion County. |
05 |
VERMILION |
40 |
0
|
MISC & PRO SERVICES
|
$1.9M |
| 78 |
70I06 |
Removal and replacement of rest area lighting at both the EB and WB Farmland Res... |
05 |
DEWITT |
26 |
1
|
ELECTRICAL
|
$2.1M |
| 79 |
91665 |
Rehabilitation of SN 092-0153 and replacement of SN 092-0155 on Voorhees St. in ... |
05 |
VERMILION |
94 |
3
|
STRUCTURAL
|
$4.2M |
| 80 |
91666 |
Replacement of PCC deck beams on a three-span structure carrying 3400 N. Rd. ove... |
05 |
CHAMPAIGN |
19 |
1
|
STRUCTURAL
|
$855,226 |
| 81 |
72250 |
Bridge superstructure replacement, bridge bearing replacement, bridge joint repl... |
06 |
ADAMS |
95 |
3
|
STRUCTURAL
|
$8.4M (93/95) |
| 82 |
72342 |
Reconstruction of Sudduth Road, 0.6 miles north of the I-55 Sherman interchange.... |
06 |
SANGAMON |
105 |
3
|
STRUCTURAL
|
$3.7M |
| 83 |
72E70 |
Bridge painting on SN 069-0035 and SN 069-0036 carrying I-72 over KCS Railroad, ... |
06 |
MORGAN |
13 |
0
|
MISC & PRO SERVICES
|
$552,965 |
| 84 |
72E77 |
Culvert wing wall repairs on SN 059-7015 carrying IL 4 over unnamed ditch, 5.4 m... |
06 |
MACOUPIN |
13 |
1
|
STRUCTURAL
|
$137,338 |
| 85 |
72E78 |
Culvert wing wall repairs on SN 009-7000 carrying IL 125 over Lost Creek Tributa... |
06 |
CASS |
5 |
3
|
MISC & PRO SERVICES
|
$106,995 |
| 86 |
72E79 |
Culvert wing wall repairs on SN 034-7043 carrying US 136 over unnamed ditch, 1 m... |
06 |
HANCOCK |
5 |
1
|
MISC & PRO SERVICES
|
$106,995 |
| 87 |
72E80 |
Culvert wing wall and channel repairs on SN 001-7089 carrying IL 104 over unname... |
06 |
ADAMS |
25 |
2
|
MISC & PRO SERVICES
|
$478,179 |
| 88 |
72E82 |
Lighting upgrades on Veterans Parkway in Springfield. |
06 |
SANGAMON |
10 |
1
|
ELECTRICAL
|
$368,826 |
| 89 |
72E87 |
Pipe culvert removal and replacement on IL 96, 0.2 mile south of TR 159 (1720 N)... |
06 |
HANCOCK |
14 |
3
|
DEMOLITION
|
$469,961 |
| 90 |
72E89 |
Culvert wing wall repairs on SN 085-2006 carrying US 67 over East Fork of Crane ... |
06 |
SCHUYLER |
7 |
2
|
MISC & PRO SERVICES
|
$249,347 |
| 91 |
72E90 |
Bridge painting of four structures over I-172 at various locations in Adams Coun... |
06 |
ADAMS |
18 |
0
|
MISC & PRO SERVICES
|
$1.0M |
| 92 |
72E91 |
Bridge painting on four structures on I-72 and IL 29 in Sangamon County. (SN 084... |
06 |
SANGAMON |
16 |
0
|
MISC & PRO SERVICES
|
$889,535 |
| 93 |
72E92 |
Bridge painting on SN 054-0057 and 054-0058 carrying I-55 over the abandoned IT ... |
06 |
LOGAN |
5 |
0
|
MISC & PRO SERVICES
|
$431,932 |
| 94 |
72E95 |
Bridge bearing replacements on SN 001-0047 carrying IL 104 over I-172 on the eas... |
06 |
ADAMS |
7 |
3
|
STRUCTURAL
|
$189,826 |
| 95 |
72E99 |
Bridge deck patching and substructure repairs on SN 068-0047 carrying TR 48 over... |
06 |
MONTGOMERY |
11 |
1
|
MISC & PRO SERVICES
|
$106,199 |
| 96 |
72C54 |
Resurfacing on IL 61 from 0.2 miles west of IL 94 to east of IL 110/336. Also in... |
06 |
ADAMS |
52 |
2
|
ASPHALT
|
$7.0M |
| 97 |
72C61 |
Resurfacing on IL 100 from 0.3 miles south of US 67 to south of Naples Road, nor... |
06 |
MORGAN |
51 |
2
|
ASPHALT
|
$3.0M |
| 98 |
72C62 |
Patching, paved shoulders, resurfacing and grading and shaping ditches on US 54 ... |
06 |
PIKE |
52 |
3
|
ASPHALT
|
$3.7M |
| 99 |
72K00 |
4 miles of patching, resurfacing, concrete curb and gutter installation, storm s... |
06 |
MORGAN |
135 |
3
|
ASPHALT
|
$8.1M (130/135) |
| 100 |
72N60 |
Patching on IL 104 from east of I-172 to just east of the Quincy Regional Airpor... |
06 |
ADAMS |
11 |
0
|
PCC FLATWORK
|
$301,816 |
| 101 |
93838 |
Widening and resurfacing of W. White Oaks Dr. from Wabash Ave. to Cascade Dr. in... |
06 |
SANGAMON |
197 |
3
|
PCC FLATWORK
|
$4.9M (192/197) |
| 102 |
93861 |
Roadway reconstruction/rehabilitation of 5th St. from 700th Ave. to I-55 overpas... |
06 |
LOGAN |
73 |
3
|
MISC & PRO SERVICES
|
$44.0M (72/73) |
| 103 |
93862 |
Construction of three-span steel wide flange beam bridge carrying CH 17 over LaH... |
06 |
HANCOCK |
63 |
1
|
STRUCTURAL
|
$2.3M |
| 104 |
74433 |
Replacement of SN 012-0014 carrying IL 1 over the CSX Railroad, 0.5 miles north ... |
07 |
CLARK |
148 |
3
|
STRUCTURAL
|
$14.6M (146/148) |
| 105 |
74435 |
Reconstructing the I-57 and IL 16 interchange located east of Mattoon from a clo... |
07 |
COLES |
360 |
2
|
EARTHWORK
|
$62.5M (355/360) |
| 107 |
74E48 |
Bridge painting at 15 locations in Cumberland and Clark Counties. |
07 |
CLARK |
46 |
0
|
MISC & PRO SERVICES
|
$3.5M |
| 108 |
74D08 |
Bridge joint replacement, bridge deck patching, bridge deck scarification, bridg... |
07 |
MACON |
69 |
2
|
MISC & PRO SERVICES
|
$7.1M |
| 109 |
95979 |
Construction of a 5-foot sidewalk along Oak St. from Vine St. to State St. and a... |
07 |
EFFINGHAM |
15 |
2
|
PCC FLATWORK
|
$278,890 |
| 111 |
76L27 |
11 miles of resurfacing on IL 140 from the Madison County line to IL 127 west ju... |
08 |
BOND |
47 |
3
|
ASPHALT
|
$14.7M |
| 112 |
76M45 |
Resurfacing and bridge repairs on I-255 from 0.5 miles south of IL 3 at Dupo to ... |
08 |
ST CLAIR |
238 |
2
|
MISC & PRO SERVICES
|
$67.1M (230/238) |
| 113 |
76M46 |
Culvert replacement on US 50 at a tributary to Turkey Creek, 1 mile east of Odin... |
08 |
MARION |
67 |
1
|
ASPHALT
|
$2.1M |
| 114 |
76R14 |
Bridge repairs and bridge deck overlay: IL 4, IL 150 over Cox Creek (SN 079-0038... |
08 |
RANDOLPH |
97 |
3
|
STRUCTURAL
|
$2.9M (96/97) |
| 115 |
76R23 |
3.6 miles of resurfacing and ADA upgrades on St. Clair Avenue from 33rd Street S... |
08 |
ST CLAIR |
55 |
2
|
ASPHALT
|
$6.4M |
| 116 |
76T92 |
7.6 miles of resurfacing and ADA improvements on IL 4 from IL 154 in Sparta to I... |
08 |
RANDOLPH |
78 |
2
|
ASPHALT
|
$7.7M |
| 117 |
76U91 |
Chemical treatment and video inspection of deep wells at various locations in Ea... |
08 |
MADISON |
9 |
1
|
MISC & PRO SERVICES
|
$885,404 |
| 118 |
76U92 |
Repair and maintenance of pump station electrical equipment at various locations... |
08 |
VARIOUS |
8 |
1
|
ELECTRICAL
|
$143,502 (7/8) |
| 119 |
76V28 |
1.2 miles of resurfacing on IL 3 from Halifax Drive to 0.2 miles north of Market... |
08 |
MONROE |
32 |
2
|
ASPHALT
|
$3.4M |
| 120 |
76V29 |
55.2 miles of pavement patching on IL 3 from Monroe to the Jackson County line a... |
08 |
RANDOLPH |
20 |
2
|
PCC FLATWORK
|
$2.8M |
| 121 |
76V30 |
Resurfacing and adding shoulders on IL 4 from 0.3 miles south of IL 143 to north... |
08 |
MADISON |
36 |
2
|
ASPHALT
|
$7.0M |
| 122 |
76V33 |
6.7 miles of resurfacing on IL 127 from US 50 South Junction in Carlyle to the W... |
08 |
CLINTON |
48 |
2
|
ASPHALT
|
$5.3M |
| 123 |
76V77 |
Multiple culvert replacements on Kinoka Road / Boat Dock Road from US 51 to 0.2 ... |
08 |
MARION |
19 |
2
|
UNDERGROUND
|
$587,335 |
| 124 |
76V80 |
4.1 miles of pavement patching on IL 159 from north of Lincoln Trail in Fairview... |
08 |
ST CLAIR |
13 |
1
|
PCC FLATWORK
|
$746,986 |
| 125 |
97877 |
Construction of roundabout at the intersection of IL 162 and Troy Rd. in the cit... |
08 |
MADISON |
118 |
3
|
PCC FLATWORK
|
$3.5M (117/118) |
| 126 |
97893 |
HMA resurfacing of East Market St. from Hickory St. to Dewey St. in the city of ... |
08 |
MADISON |
59 |
2
|
PCC FLATWORK
|
$866,326 |
| 127 |
97898 |
Construction of bi-directional turn lane with HMA resurfacing and widening on IL... |
08 |
ST CLAIR |
84 |
3
|
ASPHALT
|
$1.8M |
| 128 |
78A26 |
Bridge replacement for SN 091-0003 and 091-0004 at the Dongola Interchange on I-... |
09 |
UNION |
105 |
2
|
STRUCTURAL
|
$12.9M |
| 130 |
78A44 |
Slope stabilization on US 45, 1.2 miles south of Mills Shoals. Includes earth ex... |
09 |
WHITE |
31 |
2
|
EARTHWORK
|
$1.3M |
| 131 |
78B35 |
Bridge deck overlay and repairs to SN 097-0038 and 097-0039 on I-64 over the Lit... |
09 |
WHITE |
89 |
2
|
STRUCTURAL
|
$11.5M (87/89) |
| 132 |
78B41 |
Profile and slope adjustment, curb and gutter, ADA upgrades, drainage and inters... |
09 |
FRANKLIN |
145 |
2
|
ASPHALT
|
$3.0M |
| 133 |
78B44 |
Bridge deck overlay on SN 091-0069 carrying IL 3 / IL 146 over Running Lake Ditc... |
09 |
UNION |
29 |
2
|
MISC & PRO SERVICES
|
$400,734 |
| 135 |
78C23 |
6.9 miles of patching and resurfacing on IL 149 from IL 3 to 22nd Street in Murp... |
09 |
JACKSON |
48 |
2
|
ASPHALT
|
$6.0M |
| 136 |
78C27 |
Bridge deck concrete sealing on various bridges in Jefferson, Perry and Jackson ... |
09 |
JACKSON |
11 |
1
|
TRAFFIC CONTROL
|
$239,911 |
| 137 |
78C53 |
4.3 miles of crack sealing center lane lines on I-57 from near the Johston City ... |
09 |
WILLIAMSON |
7 |
0
|
ASPHALT
|
$142,426 |
| 138 |
99748 |
Construction of new sidewalks along Fair St. and Morning Side Dr. in the city of... |
09 |
WILLIAMSON |
18 |
2
|
PCC FLATWORK
|
$196,064 |
| 139 |
99755 |
HMA resurfacing of Wells Bypass Rd. from Veterans Memorial Dr. to IL 148 in Jeff... |
09 |
JEFFERSON |
44 |
2
|
ASPHALT
|
$995,615 (43/44) |
| 140 |
99774 |
Extending existing pipe culverts to clear zone and removing guardrail on Kathlee... |
09 |
PERRY |
18 |
2
|
EARTHWORK
|
$57,003 (17/18) |
| 141 |
99781 |
Construction of multi-use PCC path along IL 13 from Airport Rd. to County Club/ ... |
09 |
JACKSON |
57 |
2
|
PCC FLATWORK
|
$715,011 |
| 142 |
46676 |
|
00 |
VARIOUS |
102 |
1
|
FENCING & GUARDRAIL
|
$4.0M (99/102) |
| 001A |
AU072 |
Rehabilitate Auto Parking Lots and Entrance Road |
01 |
KANE |
68 |
1
|
ASPHALT
|
$2.4M (33/68) |